DOB filings
5
Active-status
5
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings5
Open or active-status records5
First included filingMar 21, 2022
Latest recorded changeSep 3, 2026

The lot

What is already here?

The lot holds a 4-story educational building built in 1931, on a 116,200 sq ft lot.

  1. Floor 4Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 10.1 m. Nothing on that side reaches this floor.
  2. Floors 2–3Nothing on record
  3. Floor 1Street levelStreet level. The lot is recorded as public facilities and institutions.
  • Street levelPublic facilities and institutions
  • Above the southern skylineFrom about floor 4 — the tallest thing within 60 m to the south is 10.1 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 27.3 m over 4 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1931
Floors
4
Residential units
0
Building type
Educational building
Land use
Public facilities and institutions
Zoning district
R4A
Lot area
116,200 sq ft
Building area
100,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 9, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 13 open notices on record for this building, out of 78 notices on file; the most recent was issued Nov 14, 2025.

  • High pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION

  • High pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION

  • High pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION

  • 10 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 8, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 4195688. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 5 alteration filing. Its latest status categories are 5 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Mar 21, 2022
Latest recorded change
Sep 3, 2026
Highest proposed story count
5 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 89-30 114 Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 5 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Mechanical work associated with the replacement of 3 Existing boilers , new Breeching, Dampers, chemical feeds , Steam valves and traps, new exhaust fans,1 new Split A/C unit. new refrigerant piping Ductwork Chimney Liner. As per plans. Filing Q00699936-S1.

    01
  2. Alteration filed

    Provide temporary sidewalk & bridging & fencing. Removal of 1 Window & provide a new Louver . Replace existing fire rated interior doors with hardware .provide an out door gas meter enclosure. provide a new fire rated wall by pool equipment room. Filing Q00699936-S2.

    02
  3. Alteration approved

    Filing Q00699936-S1 reached an approved status.

    03
  4. Alteration approved

    Filing Q00699936-S2 reached an approved status.

    04
  5. Alteration filed

    Richmond hill hs: proposed construction fence for modifications to an existing school building. fence filed in conjunction with DOB applications q00699936, 421902285, 421902640 and all related applications. Filing Q00795600-I1.

    05
  6. Alteration filed

    Supported Scaffold at Richmond Hill HS Courtyard. Filing Q08010714-I1.

    06
  7. Alteration approved

    Filing Q00795600-I1 reached an approved status.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for Q00795600-I1. That is not by itself confirmation of activity on site.

    08
  9. Alteration approved

    Filing Q08010714-I1 reached an approved status.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for Q08010714-I1. That is not by itself confirmation of activity on site.

    010
  11. Permit recorded for alteration

    DOB lists a first permit date for Q00699936-S2. That is not by itself confirmation of activity on site.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for Q00699936-S1. That is not by itself confirmation of activity on site.

    012
  13. Alteration now approved

    The latest status recorded for Q08010714-I1 is “Permit Entire.”

    013
  14. Alteration now approved

    The latest status recorded for Q00699936-S2 is “Permit Entire.”

    014
  15. Alteration now approved

    The latest status recorded for Q00795600-I1 is “Permit Entire.”

    015
  16. Alteration filed

    Mechanical work associated with the replacement of 3 Existing boilers , new Breeching, Dampers, chemical feeds , Steam valves and traps, new exhaust fans,1 new Split A/C unit. new refrigerant piping Ductwork Chimney Liner. As per plans. Filing Q00699936-A3.

    016
  17. Alteration approved

    Filing Q00699936-A3 reached an approved status.

    017
  18. Alteration now approved

    The latest status recorded for Q00699936-A3 is “Approved.”

    018
  19. Alteration now approved

    The latest status recorded for Q00699936-S1 is “Permit Entire.”

    019