DOB filing Q01358036-I1
Alteration filing at 23-10 43 Avenue
Building record · BIN 4436809
23-10 43 Avenue, Queens, NY 11101
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 12 independently sourced records, including 10 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 4436809
23-10 43 Avenue
Long Island City-Hunters Point, Queens
A consolidated public-record view · updated Oct 9, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 5-story office building built in 1931, on a 21,156 sq ft lot.
Owner of record
CP VIII LIC OWNER, LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 11, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 10 open notices on record for this building, out of 92 notices on file; the most recent was issued May 2, 2023.
Issued May 2, 2023 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Issued Apr 25, 2016
Issued Apr 25, 2016
7 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 11, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 4436809. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 12 alteration filing. Its latest status categories are 2 under review, 8 approved, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 23-10 43 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 12 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Herewith filing early work - DEMOLISH AND REMOVE ALL BUILDING MATERIALS AND SYSTEMS DOWN TO FIRST FLOOR SLAB AS DETAILED IN THE DRAWINGS. 1ST FL SLAB, BUILDING FOUNDATION AND ALL CELLAR INTERIOR COLUMNS TO REMAIN. Filing Q00924079-I1.
Early work removals - Floor 1-5 and roof - Removal of all sprinkler/standpipe components. Cellar level - removal of all sprinkler/standpipe components except EXIST. 6" DCDA AND EXIST. COMBINED FIRE/ DOMESTIC WATER SERVICE TO REMAIN. Filing Q00924079-S4.
Remove ST walls, slabs/floors, columns, and beams from the roof down to the ext. 1st fl slab. Partially remove existing first floor columns. Ext. 1st fl slab and all structure below first floor slab to remain. Filing Q00924079-S3.
Cel - ung sani/ storm piping will be abandoned in place. removals: cel,1st-5th fl - all plumbing fixtures inclu water, sanitary, vent & storm piping to be removed. roof - all roof drains, roof house tank & vent piping. Filing Q00924079-S2.
Herewith filing Mechanical removals for early work. Filing Q00924079-S1.
Filing Q00924079-S3 reached an approved status.
Filing Q00924079-S2 reached an approved status.
Filing Q00924079-S4 reached an approved status.
Filing Q00924079-S1 reached an approved status.
Filing Q00924079-I1 reached an approved status.
Partial demolition of structure using Brokk160, Bobcat S70 skid steer and Bobcat S300 skid steer with attachments. Filing Q00924079-S5.
DOB lists a first permit date for Q00924079-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for Q00924079-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for Q00924079-I1. That is not by itself confirmation of activity on site.
Filing Q00924079-S5 reached an approved status.
DOB lists a first permit date for Q00924079-S5. That is not by itself confirmation of activity on site.
Protection & Mechanical Methods application for installation of elevator hoist in conjunction w/ JOB#: Q00986401-I1 and related application: VT -Q01358054-I1. Filing Q01358036-I1.
Installation of supported scaffold for work location access. Filing Q01358087-I1.
Herewith filing Sprinkler/Standpipe/Pump in conjunction with Alt-1 Q00986401-I1 (Q508). Filing Q00992119-P1.
SOE for Elevator Pit in conjunction with alteration for new school building. Filing Q01398612-I1.
Install roof protection. Filing Q01417696-I1.
Filing Q01417696-I1 reached an approved status.
DOB lists a first permit date for Q01417696-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for Q00924079-S3. That is not by itself confirmation of activity on site.
DOB lists a first permit date for Q00924079-S4. That is not by itself confirmation of activity on site.
Filing Q01358087-I1 reached an approved status.
Roof Protection on neighboring property during construction - as shown on plans. Filing Q01435559-I1.
Filing Q01435559-I1 reached an approved status.
The latest status recorded for Q00992119-P1 is “Objections.”
DOB lists a first permit date for Q01358087-I1. That is not by itself confirmation of activity on site.
The latest status recorded for Q01358087-I1 is “Permit Entire.”
The latest status recorded for Q00924079-S1 is “Permit Entire.”
The latest status recorded for Q00924079-I1 is “Permit Entire.”
The latest status recorded for Q00924079-S4 is “Permit Entire.”
The latest status recorded for Q00924079-S3 is “Permit Entire.”
The latest status recorded for Q00924079-S2 is “Permit Entire.”
DOB lists a first permit date for Q01435559-I1. That is not by itself confirmation of activity on site.
The latest status recorded for Q01435559-I1 is “Permit Entire.”
DOB recorded a sign-off for Q01417696-I1.
The latest status recorded for Q01417696-I1 is “LOC Issued.”
DOB recorded a sign-off for Q00924079-S5.
The latest status recorded for Q00924079-S5 is “LOC Issued.”
Filing Q01398612-I1 reached an approved status.
The latest status recorded for Q01398612-I1 is “Approved.”
The latest status recorded for Q01358036-I1 is “Plan Examiner Review.”