DOB filing Q01226179-I1
Alteration filing at 79-01 Broadway
Building record · BIN 4437132
79-01 Broadway, Queens, NY 11373
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 7 independently sourced records, including 6 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 4437132
79-01 Broadway
Elmhurst, Queens
A consolidated public-record view · updated Oct 5, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 11-story health facility built in 1949, on a 276,500 sq ft lot.
Owner of record
NYC HHC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 9 open notices on record for this building, out of 219 notices on file; the most recent was issued Feb 22, 2023.
Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Issued Jan 23, 2018
Issued May 10, 2007
6 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 4437132. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 7 alteration filing. Its latest status categories are 1 recorded as completed, 4 under review, 2 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 79-01 Broadway.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 7 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Interior renovation of clinic office in a part of exisitng hospital. No change in use, egress, occupancy or bulk of building under this application. Filing Q01226179-I1.
Subsequent filing of plumbing work of Interior renovation of clinic office in a part of exisitng hospital. No change in use, egress, occupancy or bulk of building under this application. Filing Q01226179-S2.
Filing Q01226179-S2 reached an approved status.
Filing Q01226179-I1 reached an approved status.
DOB lists a first permit date for Q01226179-I1. That is not by itself confirmation of activity on site.
Elmhurst Hospital Center Roof repairs as per the plans filed including: Removal/ replacement / repairs of existing roof membrane & flashings, existing roof drains and metal coating. Masonry repointing. Install guard rails, gutters and downspouts. Filing Q01072866-I1.
Filing Q01072866-I1 reached an approved status.
DOB lists a first permit date for Q01226179-S2. That is not by itself confirmation of activity on site.
Installation of the existing 6,000-Gallon liquid oxygen tank, a 3,000 gallon liquid oxygen tank, and three (3) associated vaporizers on a new concrete pad. The existing concrete has damage so a new pad needs to be poured at the same location. Filing Q01413931-I1.
The latest status recorded for Q01226179-S2 is “Permit Entire.”
DOB lists a first permit date for Q01072866-I1. That is not by itself confirmation of activity on site.
The latest status recorded for Q01072866-I1 is “Permit Entire.”
Installation of temporary domestic water tank, followed by new 10,000 gallon domestic water tank in sub-bas to be connected to existing hospital pl fixtures as per plans. Filing Q01445385-S2.
The latest status recorded for Q01445385-S2 is “Plan Examiner Review.”
Install of new steam generator and assoc. piping, condensate pump, & supports & new condensate tank with assoc. new surge tank, supports & piping. temp header to be installed with valves and lpr piping to temp. header as per plans in mech rms. Filing Q01445385-S1.
The latest status recorded for Q01445385-S1 is “Plan Examiner Review.”
Removal/installation of new doors in mechanical rooms as per plans. no change in use, egress or occupancy. Filing Q01445385-I1.
The latest status recorded for Q01445385-I1 is “Plan Examiner Review.”
The latest status recorded for Q01413931-I1 is “Plan Examiner Review.”
DOB recorded a sign-off for Q01226179-I1.
The latest status recorded for Q01226179-I1 is “LOC Issued.”