DOB filing Q01422820-I1
New building at 45-03 Vernon Boulevard
Building record · BIN 4441057
45-03 Vernon Boulevard, Queens, NY 11101
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 12 independently sourced records, including 12 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 4441057
45-03 Vernon Boulevard
Long Island City-Hunters Point, Queens
A consolidated public-record view · updated Oct 8, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 2-story health facility built in 1931, on a 80,000 sq ft lot.
Owner of record
CARAMAT, LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 1 open notice on record for this building, out of 24 notices on file; the most recent was issued Apr 1, 2019.
Issued Apr 1, 2019
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 13, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 4441057. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 8 new building, 3 full demolition, 1 alteration filing. Its latest status categories are 6 under review, 6 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 45-03 Vernon Boulevard.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 12 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Full demolition of the existing building. Filing Q01393773-I1.
Sprinkler system removal in conjunction with FD filing Q01393773-I1. Filing Q01393773-S1.
Filing Q01393773-S1 reached an approved status.
Mechanical Equipment Use on Grade During the Mechanical Phase of a 1-Story Full Demolition Job# Q01393773-I1. Filing Q01393773-S2.
Filing Q01393773-S2 reached an approved status.
Filing Q01393773-I1 reached an approved status.
Installation of a heavy duty sidewalk shed as per plans during general construction work. no change in use, egress or occupancy. sidewalk shed shall comply with 2022 NYC building code, chapter 33. Filing Q01453307-I1.
DOB lists a first permit date for Q01453307-I1. That is not by itself confirmation of activity on site.
The latest status recorded for Q01453307-I1 is “Permit Entire.”
Proposed 10-story mixed-use building with 99 dwelling units. Filing Q01422820-I1.
DOB lists a first permit date for Q01393773-S1. That is not by itself confirmation of activity on site.
The latest status recorded for Q01393773-S1 is “Permit Entire.”
DOB lists a first permit date for Q01393773-S2. That is not by itself confirmation of activity on site.
The latest status recorded for Q01393773-S2 is “Permit Entire.”
SOE work filed in conjunction with NB Q01422820-I1. Filing Q01422820-S1.
Structural work filed in conjunction with NB Q01422820-I1. Filing Q01422820-S3.
FO work filed in conjunction with NB Q01422820-I1. Filing Q01422820-S2.
Plumbing filed in conjunction with nb. Filing Q01422820-S4.
Sprinkler/Standpipe Systems filed in conjunction with NB Q01422820-I1. Filing Q01422820-S6.
DOB lists a first permit date for Q01393773-I1. That is not by itself confirmation of activity on site.
Mechanical filed in conjunction with nb q01422820-i1. Filing Q01422820-S5.
The latest status recorded for Q01422820-S3 is “Objections.”
The latest status recorded for Q01422820-S2 is “Objections.”
The latest status recorded for Q01393773-I1 is “Permit Entire.”
Temp. Standpipe work filed in conjunction with NB Q01422820-I1. Filing Q01422820-S7.
The latest status recorded for Q01422820-S6 is “Objections.”
The latest status recorded for Q01422820-S4 is “Objections.”
The latest status recorded for Q01422820-S5 is “Objections.”
Filing Q01422820-S7 reached an approved status.
The latest status recorded for Q01422820-S7 is “Approved.”
The latest status recorded for Q01422820-I1 is “Objections.”
Filing Q01422820-S1 reached an approved status.
The latest status recorded for Q01422820-S1 is “Approved.”