DOB filing Q01262586-I1
Alteration filing at 199-06 93 Avenue
Building record · BIN 4446140
199-06 93 Avenue, Queens, NY 11423
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 2 independently sourced records, including 0 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 4446140
199-06 93 Avenue
Hollis, Queens
A consolidated public-record view · updated Aug 20, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a utility property on a 25,839 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not any single filing.
Violation record
The Department of Buildings has 3 open notices on record for this building, out of 41 notices on file; the most recent was issued Dec 1, 1992.
Issued Dec 1, 1992
Issued Apr 20, 1992
Issued Oct 12, 1989 — 2
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 4446140. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 2 alteration filing. Its latest status categories are 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 199-06 93 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 2 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Additions/ modificaitions to existing mechanical systems as per plans filed herewith. Filing Q01262586-I1.
Remove existing elevator cab, joist and associated equipment and replace with a new elevator and associated equipment replacement, Minor wall penetration for electrical conduit. Associated DOB elevator application Q01314700. Filing Q01262564-I1.
Filing Q01262586-I1 reached an approved status.
DOB lists a first permit date for Q01262586-I1. That is not by itself confirmation of activity on site.
Filing Q01262564-I1 reached an approved status.
DOB lists a first permit date for Q01262564-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for Q01262586-I1.
The latest status recorded for Q01262586-I1 is “LOC Issued.”
DOB recorded a sign-off for Q01262564-I1.
The latest status recorded for Q01262564-I1 is “LOC Issued.”