Building record · BIN 4506998

115-108GAR 225 Street

115-108GAR 225 Street, Queens, NY 11411

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 2 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 4506998

115-108GAR 225 Street

Cambria Heights, Queens

A consolidated public-record view · updated Oct 28, 2026

DOB filings
2
Active-status
2
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings2
Open or active-status records2
First included filingMay 13, 2026
Latest recorded changeOct 28, 2026

The lot

What is already here?

The lot holds a 2.5-story one-family home built in 1940, on a 4,000 sq ft lot.

  1. Floors 2–3Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as one and two family homes.
  • Street levelOne and two family homes
  • Above the southern skylineFrom about floor 4 — the tallest thing within 60 m to the south is 9.2 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 3.4 m over 3 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1940
Floors
2.5
Residential units
1
Building type
One-family home
Land use
One and two family homes
Zoning district
R2A
Lot area
4,000 sq ft
Building area
1,344 sq ft

Owner of record

CAMBRIA HEIGHTS HOLDINGS INC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 30, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 3 notices on file; the most recent was issued Jul 20, 2025.

  • Construction

    Issued Jul 20, 2025 — STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION. DAMAGE OBSERVED TO HAVE BEEN SUSTAINED. REAR TWO GARAGE. BEAMS HEAIVLY CHARRED ROOF OPEN, DOORS MISSING. RIGHT SIDE GARAGE WALL EXPOSURE 4 LEANING DUE TO FIRE

  • Unsafe

    Issued Jul 20, 2025

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 30, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 4506998. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 2 alteration filing. Its latest status categories are 2 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
May 13, 2026
Latest recorded change
Oct 28, 2026
Highest proposed story count
1 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 115-108GAR 225 Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 2 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Garage reconstruction from Fire Damage. Filing Q01397341-I1.

    01
  2. Alteration approved

    Filing Q01397341-I1 reached an approved status.

    02
  3. Alteration filed

    Garage reconstruction from Fire Damage. Filing Q01397341-P1.

    03
  4. Alteration approved

    Filing Q01397341-P1 reached an approved status.

    04
  5. Alteration now approved

    The latest status recorded for Q01397341-P1 is “Approved.”

    05
  6. Alteration now approved

    The latest status recorded for Q01397341-I1 is “Approved.”

    06