Building record · BIN 4546438

31-01 20 Avenue

31-01 20 Avenue, Queens, NY 11105

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 12 independently sourced records, including 8 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 4546438

31-01 20 Avenue

Astoria (North)-Ditmars-Steinway, Queens

A consolidated public-record view · updated Nov 10, 2026

DOB filings
12
Active-status
8
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings12
Open or active-status records8
First included filingAug 23, 2022
Latest recorded changeNov 10, 2026

The lot

What is already here?

The lot holds a utility property on a 8,073,465 sq ft lot.

  1. Floor 1Street levelStreet level. The lot is recorded as transportation and utility.
  • Street levelTransportation and utility
  • Above the southern skylineFrom about floor 6 — the tallest thing within 60 m to the south is 16.2 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 3 m over about 1 floor, counted at three metres each because the city publishes the height and not the number. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Residential units
0
Building type
Utility property
Land use
Transportation and utility
Zoning district
M3-1
Lot area
8,073,465 sq ft

Owner of record

POWER AUTHORITY OF THE STATE OF NEW YORK

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 13, 2026. They describe the tax lot, not any single filing.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Apr 4, 2024.

  • Construction

    Issued Apr 4, 2024 — BORO COMMISSIONER HAS ORDERED WORK STOPPED FOR JOB # 421950188 DUE TO FIRE SUPRESSION CONTRACTOR WITHDRAWAL

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 31, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 4546438. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 12 alteration filing. Its latest status categories are 1 under review, 7 approved, 4 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Aug 23, 2022
Latest recorded change
Nov 10, 2026
Highest proposed story count
1 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 31-01 20 Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 12 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Proposed Site Water retention system and associated work. Filing Q00712300-I1.

    01
  2. Alteration approved

    Filing Q00712300-I1 reached an approved status.

    02
  3. Alteration filed

    Minor demolition of interior partitions. Provide new stairway, ramp, HVAC dunnage as per plans submitted. Filing Q08053026-I1.

    03
  4. Alteration approved

    Filing Q08053026-I1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for Q00712300-I1. That is not by itself confirmation of activity on site.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for Q08053026-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Remove existing asphalt in the lot with in the area of work, install new subsurface stormwater infiltration system, repave the area with new asphalt, replace existing fence in place with new foundations and grounding see comments. Filing Q01276409-I1.

    07
  8. Alteration filed

    Installation of the access system scaffold @ bldg.136 as per plans. no change in use, egress or occupancy under this application. system scaffold installed in accordance with 2022 NYC building code, chapter 33. Filing Q01306848-I1.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for Q01306848-I1. That is not by itself confirmation of activity on site.

    09
  10. Alteration filed

    Installation of one-story motor control center (mcc) enclosure on foundation approved under application # q01238068-i1. Filing Q01266456-I1.

    010
  11. Alteration approved

    Filing Q01266456-I1 reached an approved status.

    011
  12. Alteration filed

    Install concrete pads as per plan. No change to egress occupancy or use involved in this application. Filing Q01357798-I1.

    012
  13. Alteration approved

    Filing Q01357798-I1 reached an approved status.

    013
  14. Alteration filed

    Mechanical installation to include nitrogen storage, vaporizers, piping, controls and other associated systems. Filing Q01315539-I1.

    014
  15. Alteration approved

    Filing Q01315539-I1 reached an approved status.

    015
  16. Alteration approved

    Filing Q01276409-I1 reached an approved status.

    016
  17. Alteration filed

    Foundation work including pile and civil. Filing Q01400927-I1.

    017
  18. Alteration approved

    Filing Q01400927-I1 reached an approved status.

    018
  19. Alteration filed

    Installation of prefabricated shed. Filing Q01415452-I1.

    019
  20. Permit recorded for alteration

    DOB lists a first permit date for Q01357798-I1. That is not by itself confirmation of activity on site.

    020
  21. Alteration approved

    Filing Q01415452-I1 reached an approved status.

    021
  22. Permit recorded for alteration

    DOB lists a first permit date for Q01415452-I1. That is not by itself confirmation of activity on site.

    022
  23. Permit recorded for alteration

    DOB lists a first permit date for Q01400927-I1. That is not by itself confirmation of activity on site.

    023
  24. Alteration filed

    Installation of new concrete foundations for electrical equipment of relay enclosure and coupling capacitor potential devices & their associated foundations at con edison's luyster creek / astoria west substation. Filing Q01412304-I1.

    024
  25. Alteration approved

    Filing Q01412304-I1 reached an approved status.

    025
  26. Permit recorded for alteration

    DOB lists a first permit date for Q01412304-I1. That is not by itself confirmation of activity on site.

    026
  27. Alteration now approved

    The latest status recorded for Q01412304-I1 is “Permit Entire.”

    027
  28. Permit recorded for alteration

    DOB lists a first permit date for Q01315539-I1. That is not by itself confirmation of activity on site.

    028
  29. Alteration now approved

    The latest status recorded for Q01315539-I1 is “Permit Entire.”

    029
  30. Permit recorded for alteration

    DOB lists a first permit date for Q01266456-I1. That is not by itself confirmation of activity on site.

    030
  31. Alteration now approved

    The latest status recorded for Q01266456-I1 is “Permit Entire.”

    031
  32. Alteration now approved

    The latest status recorded for Q08053026-I1 is “Permit Entire.”

    032
  33. Alteration signed off

    DOB recorded a sign-off for Q01415452-I1.

    033
  34. Alteration now completed

    The latest status recorded for Q01415452-I1 is “LOC Issued.”

    034
  35. Alteration signed off

    DOB recorded a sign-off for Q01400927-I1.

    035
  36. Alteration now completed

    The latest status recorded for Q01400927-I1 is “LOC Issued.”

    036
  37. Alteration signed off

    DOB recorded a sign-off for Q00712300-I1.

    037
  38. Alteration now completed

    The latest status recorded for Q00712300-I1 is “LOC Issued.”

    038
  39. Permit recorded for alteration

    DOB lists a first permit date for Q01276409-I1. That is not by itself confirmation of activity on site.

    039
  40. Alteration now approved

    The latest status recorded for Q01276409-I1 is “Permit Entire.”

    040
  41. Alteration signed off

    DOB recorded a sign-off for Q01357798-I1.

    041
  42. Alteration now completed

    The latest status recorded for Q01357798-I1 is “LOC Issued.”

    042
  43. Alteration filed

    Install (3) 12K BTU Ceiling Cassettes with 36K BTU Condenser new install with Fresh Air intake. No change to occupancy, use or egress. Filing Q01453413-I1.

    043
  44. Alteration now approved

    The latest status recorded for Q01306848-I1 is “Permit Entire.”

    044
  45. Alteration approved

    Filing Q01453413-I1 reached an approved status.

    045
  46. Permit recorded for alteration

    DOB lists a first permit date for Q01453413-I1. That is not by itself confirmation of activity on site.

    046
  47. Alteration now approved

    The latest status recorded for Q01453413-I1 is “Permit Entire.”

    047
  48. Alteration filed

    Installation of liquefier and associated equipment and controls. Filing Q01469575-I1.

    048
  49. Alteration now under review

    The latest status recorded for Q01469575-I1 is “Prof Cert QA Review.”

    049