Building record · BIN 4625019

32-03 Harper Street

32-03 Harper Street, Queens, NY 11368

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 12 independently sourced records, including 12 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 4625019

32-03 Harper Street

Flushing-Willets Point, Queens

A consolidated public-record view · updated Nov 23, 2026

DOB filings
12
Active-status
12
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings12
Open or active-status records12
First included filingMar 14, 2024
Latest recorded changeNov 23, 2026

The lot

What is already here?

The lot holds a 1-story transportation facility built in 1937, on a 243,850 sq ft lot.

Built
1937
Last altered
2025
Floors
1
Residential units
0
Building type
Transportation facility
Land use
Transportation and utility
Zoning district
M3-1
Lot area
243,850 sq ft
Building area
239,168 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 25, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 10, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 4625019. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 5 new building, 7 alteration filing. Its latest status categories are 3 under review, 9 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Mar 14, 2024
Latest recorded change
Nov 23, 2026
Highest proposed story count
5 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 32-03 Harper Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 12 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    General construction alterations for proposed underground utilities work and early site work in conjunction with New Building Job# Q01007052; related work as per plans. Filing Q01007091-I1.

    01
  2. Alteration filed

    Plumbing alterations for proposed installation of water, sanitary, and storm services for building and rainwater collection tank in conjunction with New Building Job# Q01007052; related work as per plans. Filing Q01007091-S1.

    02
  3. Alteration filed

    Installation of temporary dry fire standpipe system in conjunction with construction of New Building (Job# Q01007052); related work as per plans. Filing Q01016671-I1.

    03
  4. Alteration approved

    Filing Q01016671-I1 reached an approved status.

    04
  5. Alteration approved

    Filing Q01007091-I1 reached an approved status.

    05
  6. New building filed

    Boiler Equipment alterations for proposed installation of fuel storage tank and pump serving roof-mounted emergency generator; related work as per plans. Filing Q01007052-S5.

    06
  7. New building filed

    Plumbing, sprinkler, and standpipe work for proposed new 5-story office building with bulkheads; related work as per plans. Filing Q01007052-S3.

    07
  8. Alteration approved

    Filing Q01007091-S1 reached an approved status.

    08
  9. New building filed

    Structural work for proposed new 5-story office building with bulkheads; related work as per plans. Filing Q01007052-S1.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for Q01007091-I1. That is not by itself confirmation of activity on site.

    010
  11. New building approved

    Filing Q01007052-S1 reached an approved status.

    011
  12. New building filed

    Plumbing alterations for proposed site utility and drainage systems; related work as per plans. Filing Q01007052-S6.

    012
  13. New building approved

    Filing Q01007052-S5 reached an approved status.

    013
  14. New building approved

    Filing Q01007052-S3 reached an approved status.

    014
  15. New building approved

    Filing Q01007052-S6 reached an approved status.

    015
  16. Permit recorded for new building

    DOB lists a first permit date for Q01007052-S3. That is not by itself confirmation of activity on site.

    016
  17. Permit recorded for new building

    DOB lists a first permit date for Q01007052-S6. That is not by itself confirmation of activity on site.

    017
  18. Permit recorded for new building

    DOB lists a first permit date for Q01007052-S1. That is not by itself confirmation of activity on site.

    018
  19. Permit recorded for alteration

    DOB lists a first permit date for Q01007091-S1. That is not by itself confirmation of activity on site.

    019
  20. Permit recorded for alteration

    DOB lists a first permit date for Q01016671-I1. That is not by itself confirmation of activity on site.

    020
  21. Alteration filed

    Proposed curb cut installation in conjunction with New Building Job# Q01007052. (Note: Previously-approved plans under Q01061864-I1 re-filed due to initial permit expiring.). Filing Q01061864-S1.

    021
  22. Alteration filed

    Proposed curb cut installation in conjunction with New Building Job# Q01007052. (Note: Previously-approved plans under Q01061864-I1 re-filed due to initial permit expiring.). Filing Q01061869-S1.

    022
  23. New building now approved

    The latest status recorded for Q01007052-S1 is “Permit Entire.”

    023
  24. New building filed

    Boiler Equipment alterations for proposed installation of fuel storage tank and pump serving roof-mounted emergency generator; related work as per plans. Filing Q01007052-P6.

    024
  25. Alteration now approved

    The latest status recorded for Q01007091-I1 is “Permit Entire.”

    025
  26. New building approved

    Filing Q01007052-P6 reached an approved status.

    026
  27. New building now approved

    The latest status recorded for Q01007052-P6 is “Approved.”

    027
  28. Alteration filed

    Installation and use of temporary telehandler construction equipment as per plans filed herewith. This application is filed in conjunction with NB Q01007052-I1. Filing Q01462308-I1.

    028
  29. Permit recorded for alteration

    DOB lists a first permit date for Q01462308-I1. That is not by itself confirmation of activity on site.

    029
  30. Permit recorded for new building

    DOB lists a first permit date for Q01007052-S5. That is not by itself confirmation of activity on site.

    030
  31. New building now approved

    The latest status recorded for Q01007052-S5 is “Permit Entire.”

    031
  32. Alteration approved

    Filing Q01061864-S1 reached an approved status.

    032
  33. Alteration approved

    Filing Q01061869-S1 reached an approved status.

    033
  34. Permit recorded for alteration

    DOB lists a first permit date for Q01061864-S1. That is not by itself confirmation of activity on site.

    034
  35. Alteration now approved

    The latest status recorded for Q01061864-S1 is “Permit Entire.”

    035
  36. Permit recorded for alteration

    DOB lists a first permit date for Q01061869-S1. That is not by itself confirmation of activity on site.

    036
  37. Alteration now approved

    The latest status recorded for Q01061869-S1 is “Permit Entire.”

    037
  38. New building now approved

    The latest status recorded for Q01007052-S6 is “Permit Entire.”

    038
  39. Alteration now approved

    The latest status recorded for Q01462308-I1 is “Permit Entire.”

    039
  40. Alteration filed

    Installation and use of temporary telehandler construction equipment as per plans filed herewith. This application is filed in conjunction with NB Q01007052-I1. Filing Q01462308-P1.

    040
  41. Alteration approved

    Filing Q01462308-P1 reached an approved status.

    041
  42. Alteration now approved

    The latest status recorded for Q01462308-P1 is “Approved.”

    042
  43. New building now under review

    The latest status recorded for Q01007052-S3 is “On Hold - Pending Supersede of Applicant of Record.”

    043
  44. Alteration now under review

    The latest status recorded for Q01016671-I1 is “On Hold - Pending Supersede of Applicant of Record.”

    044
  45. Alteration now under review

    The latest status recorded for Q01007091-S1 is “On Hold - Pending Supersede of Applicant of Record.”

    045