DOB filing Q01444851-S2
Alteration filing at 153-10 Hillside Avenue
Building record · BIN 4625619
153-10 Hillside Avenue, Queens, NY 11432
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 16 independently sourced records, including 16 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 4625619
153-10 Hillside Avenue
Jamaica, Queens
A consolidated public-record view · updated Nov 6, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a vacant land on a 48,804 sq ft lot.
Owner of record
GUOCO DEVELOPMENT LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 10, 2026. They describe the tax lot, not any single filing.
Violation record
No open violations are recorded for this building.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 10, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 4625619. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 8 alteration filing, 8 new building. Its latest status categories are 14 approved, 2 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 153-10 Hillside Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 16 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Construct new 6 story school building as per plans filed. Filing Q01220686-I1.
Construction Fence filed in conjunction with new 6 story Charter School (Success Academy). Filing Q01301513-I1.
Filing Q01301513-I1 reached an approved status.
DOB lists a first permit date for Q01301513-I1. That is not by itself confirmation of activity on site.
Install underrground plumbing as per plans filed. no change in use egress or occupancy. Filing Q01220686-S8.
Install sprinkler standpipe system as per plans filed. no change in use egress or occupancy. Filing Q01220686-S6.
Mechanical filing as per plans filed. Filing Q01220686-S4.
Filing Q01220686-S8 reached an approved status.
DOB lists a first permit date for Q01220686-S8. That is not by itself confirmation of activity on site.
Filing Q01220686-S6 reached an approved status.
Install emergency generator as per plans filed. Filing Q01220686-Z3.
Structural work as per plans filed. Filing Q01220686-S3.
DOB lists a first permit date for Q01220686-S6. That is not by itself confirmation of activity on site.
Magni used to hoist & load formwork, rebar, wire mesh material & concrete trowel machines. Filing Q01450506-I1.
DOB lists a first permit date for Q01450506-I1. That is not by itself confirmation of activity on site.
The latest status recorded for Q01450506-I1 is “Permit Entire.”
Install underrground plumbing as per plans filed. no change in use egress or occupancy. Filing Q01220686-A3.
Filing Q01220686-S4 reached an approved status.
The latest status recorded for Q01220686-S4 is “Approved.”
The latest status recorded for Q01220686-S6 is “On Hold - Pending Supersede of Applicant of Record.”
The latest status recorded for Q01301513-I1 is “Permit Entire.”
Filing Q01220686-A3 reached an approved status.
The latest status recorded for Q01220686-A3 is “Approved.”
The latest status recorded for Q01220686-S8 is “Permit Entire.”
Install temporary dry standpipe alarm system during construction. No change in use egress or occupancy. Filing Q01220686-S7.
Filing Q01220686-I1 reached an approved status.
Filing Q01220686-Z3 reached an approved status.
The latest status recorded for Q01220686-Z3 is “Approved.”
Equipment use: dual 7000 # capacity personnel hoist during nb const, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator application submitted separately. Filing Q01471360-I1.
DOB lists a first permit date for Q01471360-I1. That is not by itself confirmation of activity on site.
The latest status recorded for Q01471360-I1 is “Permit Entire.”
DOB lists a first permit date for Q01220686-I1. That is not by itself confirmation of activity on site.
The latest status recorded for Q01220686-I1 is “Permit Entire.”
Knuckleboom placement. this application involves no change in use, occupancy or egress. Filing Q01478822-I1.
Filing Q01220686-S3 reached an approved status.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. Filing Q01444851-S1.
DOB lists a first permit date for Q01444851-S1. That is not by itself confirmation of activity on site.
The latest status recorded for Q01444851-S1 is “Permit Entire.”
Installation of temporary roof protection as per plan. no change in use, egress, or occupancy. Filing Q01444851-I1.
DOB lists a first permit date for Q01444851-I1. That is not by itself confirmation of activity on site.
The latest status recorded for Q01444851-I1 is “Permit Entire.”
Filing Q01220686-S7 reached an approved status.
The latest status recorded for Q01220686-S7 is “Approved.”
Filing Q01478822-I1 reached an approved status.
Tbd. Filing Q01444851-S2.
Construction Fence filed in conjunction with new 6 story Charter School (Success Academy). Filing Q01301513-P1.
The latest status recorded for Q01301513-P1 is “Pending Plan Examiner Assignment.”
DOB lists a first permit date for Q01444851-S2. That is not by itself confirmation of activity on site.
The latest status recorded for Q01444851-S2 is “Permit Entire.”
DOB lists a first permit date for Q01478822-I1. That is not by itself confirmation of activity on site.
The latest status recorded for Q01478822-I1 is “Permit Entire.”
DOB lists a first permit date for Q01220686-S3. That is not by itself confirmation of activity on site.
The latest status recorded for Q01220686-S3 is “Permit Entire.”