DOB filing Q01338002-P1
Alteration filing at 218-24 Hartland Avenue
Building record · BIN 4625786
218-24 Hartland Avenue, Queens, NY 11364
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 12 independently sourced records, including 12 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 4625786
218-24 Hartland Avenue
Oakland Gardens-Hollis Hills, Queens
A consolidated public-record view · updated Oct 27, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 3-story educational building built in 1957, on a 120,000 sq ft lot.
Owner of record
AMERICAN MARTYRS R C CHURCH
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 29, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 4625786. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 2 alteration filing, 10 new building. Its latest status categories are 2 approved, 10 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 218-24 Hartland Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 12 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
P.S. 188-Q: Proposed new 3 story school building. Filing Q01332952-I1.
P.s. 188-q: support of excavation for a new 3-story school building. Filing Q01338002-I1.
P.S. 188-Q: Subsequent filing of Structural work type for a new 3 story school building. Filing Q01332952-S2.
P.S. 188-Q: Subsequent filing of Foundation work type for anew 3 story school building. Filing Q01332952-S1.
P.S. 188-Q: Subsequent filing of Plumbing Civil work type for a new 3 story school building. Site plumbing and drainage for new school building. Filing Q01332952-S4.
P.S. 188-Q: Subsequent filing of general construction and earthwork work types for a new 3 story school building. Sitework, landscaping and site improvements for new school building. Filing Q01332952-S3.
PA 188-Q: Subsequent filing of General Plumbing work type. Filing Q01332952-S6.
PS 188-Q: Subsequent filing of Mechanical and Lighting work for a new 3 story school building. Filing Q01332952-S5.
Filing Q01338002-I1 reached an approved status.
P.S. 188-Q: Subsequent filing of Sprinkler and Standpipe work types. Automatic wet sprinkler system with sprinkler booster pump. Floor control valve assemblies at each floor. Class 1 manual wet standpipe. FHV in recessed cabinets within each stairway. Filing Q01332952-S7.
P.s. 188-q: subsequent filing of underground plumbing for a new 3-story school building. Filing Q01332952-S8.
Sub-Slab Depressurization System for New School Building. Filing Q01332952-S9.
The latest status recorded for Q01332952-S3 is “Objections.”
The latest status recorded for Q01332952-S9 is “Objections.”
The latest status recorded for Q01332952-S2 is “Objections.”
The latest status recorded for Q01332952-S1 is “Objections.”
P.s. 188-q: support of excavation for a new 3-story school building. Filing Q01338002-P1.
The latest status recorded for Q01332952-I1 is “Objections.”
The latest status recorded for Q01332952-S5 is “Objections.”
The latest status recorded for Q01332952-S4 is “Objections.”
The latest status recorded for Q01332952-S7 is “Plan Examiner Review.”
The latest status recorded for Q01332952-S6 is “Plan Examiner Review.”
The latest status recorded for Q01332952-S8 is “Plan Examiner Review.”
Filing Q01338002-P1 reached an approved status.
The latest status recorded for Q01338002-P1 is “Approved.”
The latest status recorded for Q01338002-I1 is “Approved.”