DOB filing Q01352314-S2
Alteration filing at 149-04 Rockaway Boulevard
Building record · BIN 4625884
149-04 Rockaway Boulevard, Queens, NY 11436
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 12 independently sourced records, including 12 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 4625884
149-04 Rockaway Boulevard
Baisley Park, Queens
A consolidated public-record view · updated Oct 14, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 1-story garage or fuel station built in 1964, on a 15,107 sq ft lot.
What it sold for
The property itself last changed hands for $5,000,000 on Sep 16, 2026.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
UNION UNITED METHODIST CHURCH
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 17, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 13, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 4625884. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 6 alteration filing, 6 new building. Its latest status categories are 12 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 149-04 Rockaway Boulevard.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 12 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Proposed 2,777 SF convenience store building accessory to automotive service station. Filing Q00883908-I1.
Existing 17.5' curb cut located on Rockaway Boulevard to be enlarged to 30' as indicated on plans. No change to use, egress or occupancy. Filing Q01352297-S1.
Existing 26.6' curb cut located on 150th Street to be enlarged to 30' as indicated on plans. No change to use, egress or occupancy. Filing Q01352297-S2.
Installation of 30' curb cut located on Rockaway Avenue as indicated on plans. No change to use, egress or occupancy. Filing Q01352297-I1.
Subsequent filing for the structural and foundational scope of work for proposed canopy. No change in use, egress or occupancy. Filing Q01352314-S1.
Installation of new 57' x 69' canopy over fuel dispenser islands. No change to use, egress, or occupancy. Filing Q01352314-I1.
Filing Q01352297-S2 reached an approved status.
Filing Q01352314-S1 reached an approved status.
Filing Q01352314-I1 reached an approved status.
Filing Q01352297-S1 reached an approved status.
Filing Q01352297-I1 reached an approved status.
Subsequent filing for building plumbing scope of work only associated with the new building. Filing Q00883908-S3.
Subsequent filing for structural & foundation scope of work associated with the new building. Filing Q00883908-S1.
Filing Q00883908-S1 reached an approved status.
Subsequent filing for mechanical scope of work associated with the new building. Filing Q00883908-S2.
Plumbing work associated with new canopy stormwater drainage. No change to use, egress or occupancy. Filing Q01352314-S2.
Filing Q00883908-S2 reached an approved status.
Filing Q00883908-S3 reached an approved status.
Filing Q01352314-S2 reached an approved status.
Subsequent filing for site plumbing only. Filing Q00883908-S4.
Subsequent filing for site/civil work only. Filing Q00883908-S5.
Filing Q00883908-S4 reached an approved status.
Filing Q00883908-S5 reached an approved status.
Filing Q00883908-I1 reached an approved status.
DOB lists a first permit date for Q01352314-I1. That is not by itself confirmation of activity on site.
The latest status recorded for Q01352314-I1 is “Permit Entire.”
DOB lists a first permit date for Q00883908-I1. That is not by itself confirmation of activity on site.
The latest status recorded for Q00883908-I1 is “Permit Entire.”
DOB lists a first permit date for Q00883908-S1. That is not by itself confirmation of activity on site.
The latest status recorded for Q00883908-S1 is “Permit Entire.”
DOB lists a first permit date for Q00883908-S5. That is not by itself confirmation of activity on site.
The latest status recorded for Q00883908-S5 is “Permit Entire.”
DOB lists a first permit date for Q01352314-S1. That is not by itself confirmation of activity on site.
The latest status recorded for Q01352314-S1 is “Permit Entire.”
DOB lists a first permit date for Q00883908-S2. That is not by itself confirmation of activity on site.
The latest status recorded for Q00883908-S2 is “Permit Entire.”
DOB lists a first permit date for Q01352314-S2. That is not by itself confirmation of activity on site.
The latest status recorded for Q01352314-S2 is “Permit Entire.”
DOB lists a first permit date for Q00883908-S3. That is not by itself confirmation of activity on site.
The latest status recorded for Q00883908-S3 is “Permit Entire.”
DOB lists a first permit date for Q01352297-S1. That is not by itself confirmation of activity on site.
The latest status recorded for Q01352297-S1 is “Permit Entire.”
DOB lists a first permit date for Q01352297-S2. That is not by itself confirmation of activity on site.
The latest status recorded for Q01352297-S2 is “Permit Entire.”
DOB lists a first permit date for Q01352297-I1. That is not by itself confirmation of activity on site.
The latest status recorded for Q01352297-I1 is “Permit Entire.”
DOB lists a first permit date for Q00883908-S4. That is not by itself confirmation of activity on site.
The latest status recorded for Q00883908-S4 is “Permit Entire.”