DOB filing S08021838-Z4
Alteration filing at 751 Mill Road
Building record · BIN 5135536
751 Mill Road, Staten Island, NY 10306
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 8 independently sourced records, including 8 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 5135536
751 Mill Road
Oakwood-Richmondtown, Staten Island
A consolidated public-record view · updated Oct 7, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a utility property on a 1,142,766 sq ft lot.
Owner of record
NYC DOT
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not any single filing.
Violation record
The Department of Buildings has 5 open notices on record for this building, out of 44 notices on file; the most recent was issued Dec 16, 2021.
Issued Dec 16, 2021
Issued Dec 16, 2021
Issued Dec 21, 2020
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 9, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 5135536. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 8 alteration filing. Its latest status categories are 8 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 751 Mill Road.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 8 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Filing here general construction work related to demolition of equipment, concrete pads, repairs, patch and repaint related to replacement and installation of sludge thickening equipment in main building. No change in use, egress or occupancy. Filing S08021838-I1.
General Construction work related demolition of equipment, concrete pads, repairs, patch and repaint related to sludge dilution water and seal water pump replacement in Microstrainer Building - No change in use, egress or occupancy. Filing S08021839-I1.
Plumbing work for new hot water heater for eyewash and shower for polymer transfer/polymer storage in Main Building and relocation of existing drain piping. No change in use, egress or occupancy under this application. Filing S08021838-Z1.
RPZ replacements, construction of a new water supply loop to improve water distribution through the facility. Connection of water loop to Dewatering Building. Filing S00870290-S1.
Filing S00870290-S1 reached an approved status.
General Construction/Structural for Splitter box rehab; GBT foundations; pump and equipment pads; polymer tank and mixing system pad (micropiles); standard details-Main Building. No change in use, egress or occupancy. Filing S08021838-S2.
Filing herewith: Basement FLR - New resinous floor for Polymer Storage area; FLR 001 - Intumescent paint under ELEC control room; Roof - Partial Removal and Replacement of Roofing on Main Building. No Change in use or occupancy. No major change in egress. Filing S08021838-Z3.
Filing S08021838-Z3 reached an approved status.
Filing S08021838-Z1 reached an approved status.
Filing S08021838-S2 reached an approved status.
Mechanical work related to sludge storage dilution water and seal water pump replacement in Microstrainer Building No change in use, egress, or occupancy. Filing S08021839-S1.
Filing S08021839-I1 reached an approved status.
Filing S08021839-S1 reached an approved status.
DOB lists a first permit date for S08021838-Z1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for S08021838-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for S08021839-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for S08021839-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for S08021838-Z3. That is not by itself confirmation of activity on site.
Mechanical systems related to sludge thickening equipment replacement- primarily pumps and piping, gravity belt thickeners. includes replacement of sludge thickener itnternal mechanisms demolition of existing mechanical equipment and ppiping in main bldg. Filing S08021838-Z4.
Filing S08021838-I1 reached an approved status.
Filing S08021838-Z4 reached an approved status.
DOB lists a first permit date for S08021838-Z4. That is not by itself confirmation of activity on site.
DOB lists a first permit date for S08021838-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for S00870290-S1. That is not by itself confirmation of activity on site.
The latest status recorded for S08021838-Z1 is “Permit Entire.”
The latest status recorded for S08021838-S2 is “Permit Entire.”
The latest status recorded for S08021839-I1 is “Permit Entire.”
The latest status recorded for S08021839-S1 is “Permit Entire.”
The latest status recorded for S08021838-Z3 is “Permit Entire.”
The latest status recorded for S00870290-S1 is “Permit Entire.”
The latest status recorded for S08021838-Z4 is “Permit Entire.”
The latest status recorded for S08021838-I1 is “Permit Entire.”