Building record · BIN 5177580

274 Victory Boulevard

274 Victory Boulevard, Staten Island, NY 10301

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 5 independently sourced records, including 5 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 5177580

274 Victory Boulevard

Tompkinsville-Stapleton-Clifton-Fox Hills, Staten Island

A consolidated public-record view · updated Sep 22, 2026

DOB filings
5
Active-status
5
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings5
Open or active-status records5
First included filingOct 18, 2024
Latest recorded changeSep 22, 2026

The lot

What is already here?

The lot holds a 5-story elevator apartment building built in 2026, with 75 homes, on a 30,267 sq ft lot.

Built
2026
Floors
5
Residential units
75
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6B
Lot area
30,267 sq ft
Building area
76,417 sq ft

Owner of record

UTC PROPERTIES, INC.

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building. 1 notice is on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 5177580. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 2 alteration filing, 3 new building. Its latest status categories are 5 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Oct 18, 2024
Latest recorded change
Sep 22, 2026
Highest proposed story count
5 stories
Highest proposed unit count
75 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 274 Victory Boulevard.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 5 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. New building filed

    It is proposed to file for structural work for proposed new five (5) story building as shown on plans. Filing S01016888-S2.

    01
  2. New building filed

    It is proposed to file for plumbing work for proposed new building as shown on plans. Filing S01016888-S5.

    02
  3. New building approved

    Filing S01016888-S2 reached an approved status.

    03
  4. New building approved

    Filing S01016888-S5 reached an approved status.

    04
  5. Permit recorded for new building

    DOB lists a first permit date for S01016888-S2. That is not by itself confirmation of activity on site.

    05
  6. Permit recorded for new building

    DOB lists a first permit date for S01016888-S5. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Supported Pipe Scaffolding. Filing S01447470-I1.

    07
  8. Alteration filed

    Suspended Scaffolding. Filing S01447497-I1.

    08
  9. Alteration approved

    Filing S01447497-I1 reached an approved status.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for S01447497-I1. That is not by itself confirmation of activity on site.

    010
  11. Alteration now approved

    The latest status recorded for S01447497-I1 is “Permit Entire.”

    011
  12. New building filed

    It is proposed to file for plumbing work for proposed new building as shown on plans. Filing S01016888-P9.

    012
  13. Alteration approved

    Filing S01447470-I1 reached an approved status.

    013
  14. New building approved

    Filing S01016888-P9 reached an approved status.

    014
  15. New building now approved

    The latest status recorded for S01016888-P9 is “Approved.”

    015
  16. New building now approved

    The latest status recorded for S01016888-S5 is “Permit Entire.”

    016
  17. New building now approved

    The latest status recorded for S01016888-S2 is “Permit Entire.”

    017
  18. Permit recorded for alteration

    DOB lists a first permit date for S01447470-I1. That is not by itself confirmation of activity on site.

    018
  19. Alteration now approved

    The latest status recorded for S01447470-I1 is “Permit Entire.”

    019