NYC DOB record · M01469047-I1

1 5 Avenue

1 5 Avenue, Manhattan, NY 10003

Alteration filing in Greenwich Village, Manhattan. The latest DOB status is plan examiner review.

A DOB plan examiner is reviewing the application. Nothing has been approved yet. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 17, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01469047-I1

1 5 Avenue

Manhattan, NY 10003

Alteration filing · status dated Oct 14, 2026

Current record
Under review
Proposed scale
27 stories
Dwelling units
198
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01469047-I1 as a alteration filing at 1 5 Avenue, Manhattan, NY 10003. Its latest published status category is Under review, dated Oct 14, 2026. The filing records 27 proposed stories and 198 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Oct 14, 2026
Proposed scale
27 proposed stories and 198 proposed dwelling units
The building, not the filingopen housing violations, what it sold for and every filing at BIN 1008847Applicant of recordSee the 7 filings that name Rojas Ap
FiledOct 13, 2026
Current recordUnder review
Proposed scale27 stories
Recorded cost$809,305

What the filing says

A public-record reading of the proposed work.

Consolidation and interior reconfiguration of apartments 3g and 3hj into a unified private residence with fullrenovation in 3g and selective renovation in 3hj. no change to use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 27-story elevator apartment building built in 1926, with 198 homes, on a 12,000 sq ft lot.

Built
1926
Last altered
1988
Floors
27
Residential units
198
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10
Lot area
12,000 sq ft
Building area
238,923 sq ft
Historic district
Greenwich Village Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 17, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 78 notices on file; the most recent was issued Aug 26, 2008.

  • Construction

    Issued Aug 26, 2008

  • Construction

    Issued Jul 1, 2008

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 16, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01469047-I1.

    01
  2. Current status updated

    The latest recorded filing status is “Plan Examiner Review.”

    02

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 87,269 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01469047-I1
BBL
1005500022
Review type
Standard Plan Examination
Existing stories
27
Proposed stories
27
Existing dwelling units
198
Proposed dwelling units
198
General construction