What the filing says
A public-record reading of the proposed work.
Alteration type 3 - construction equipment - scaffold proposed installation of pipe scaffold for new building as per plans. no change in use occupancy or egress under this application
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 15-story transportation facility built in 1958, on a 6,429,961 sq ft lot.
- Built
- 1958
- Last altered
- 2023
- Floors
- 15
- Residential units
- 0
- Building type
- Transportation facility
- Land use
- Transportation and utility
- Zoning district
- M3-1
- Lot area
- 6,429,961 sq ft
- Building area
- 7,058,736 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 22 open notices on record for this building, out of 115 notices on file; the most recent was issued Sep 8, 2021.
- Elevator
Issued Sep 8, 2021
- Elevator
Issued Sep 7, 2021
- Elevator
Issued Sep 2, 2021
19 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00048503-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00048503-I1
- BBL
- 3020230001
- Postal code
- 11251 · 43 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source