NYC DOB record · M00991872-I1

1 Hudson Street

1 Hudson Street, Manhattan, NY 10013

Alteration filing in Tribeca-Civic Center, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 8, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00991872-I1

1 Hudson Street

Manhattan, NY 10013

Alteration filing · status dated Nov 6, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
10
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00991872-I1 as a alteration filing at 1 Hudson Street, Manhattan, NY 10013. Its latest published status category is Approved, dated Nov 6, 2026. The filing records 10 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 6, 2026
Proposed scale
10 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1001500Applicant of recordSee the 43 filings that name Hanington Engineering Consultants
FiledJan 25, 2024
Current recordApproved
Proposed scale10 units
Recorded cost$20,000

What the filing says

A public-record reading of the proposed work.

Filing herewith modification of plumbing work as indicated on the drawings. no change in use egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 10-story elevator apartment building built in 1915, with 10 homes, on a 2,380 sq ft lot.

Built
1915
Floors
10
Residential units
10
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
C6-3A
Lot area
2,380 sq ft
Building area
25,473 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 7, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 48 notices on file; the most recent was issued Mar 2, 2023.

  • Construction

    Issued Mar 2, 2023 — EMERGENCY WORK ORDER DUE TO DAMAGED FACADE@EXP#4(E.HUDSON ST)INADEQATE /TEMPORARY REPAIRS TO STONEWORK&CRACKS IN STONES ON EXP#4.REMEDY:IMMED TAKE&PROVIDE SAFETY MEASURES TO SECURE&PROTECT THE.PUB.&INSTALL PUB PROTECT@EXP#4.ADD.REMOVE&SECURE ANY&ALL LOOSE HANGING MATERIAL.REMEDY: PROVIDE ADEQ.SAFETY MEASURES/IMMED.MAKE REPAIRS UNDER SUPERV.LIC PROF

  • Elevator

    Issued Mar 5, 2021

  • Elevator

    Issued Mar 5, 2021

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 8, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00991872-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 94,142 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00991872-I1
BBL
1001400001
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
10
Proposed dwelling units
10