NYC DOB record · M00947968-I1

1 Pier 76

1 Pier 76, Manhattan, NY 10018

Alteration filing in Chelsea-Hudson Yards, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 19, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00947968-I1

1 Pier 76

Manhattan, NY 10018

Alteration filing · status dated Sep 17, 2026

Current record
Approved
Proposed scale
2 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00947968-I1 as a alteration filing at 1 Pier 76, Manhattan, NY 10018. Its latest published status category is Approved, dated Sep 17, 2026. The filing records 2 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 17, 2026
Proposed scale
2 proposed stories
Applicant of recordSee the 109 filings that name Urban Integrations
FiledOct 17, 2023
Current recordApproved
Proposed scale2 stories
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Installation of temp tents and inflatables, no alt to exist structures for Bike MS NYC. TPA required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 1-story transportation facility built in 1900, on a 588,000 sq ft lot.

Built
1900
Floors
1
Residential units
0
Building type
Transportation facility
Land use
Transportation and utility
Zoning district
M2-3
Lot area
588,000 sq ft
Building area
393,040 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 27 notices on file; the most recent was issued Mar 12, 2026.

  • Construction

    Issued Mar 12, 2026 — BOROUGH COMMISSIONER STOP WORK ORDER APPLICATION # 123297253 DUE TO APPLICANT WITHDRAWAL.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00947968-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00947968-I1
BIN
1012261
BBL
1006650010
Review type
Professional Certification
Existing stories
2
Proposed stories
2
Existing dwelling units
0
Proposed dwelling units
0
General construction