What the filing says
A public-record reading of the proposed work.
Filing for minor Interior Renovation of Unit 7C on 7th Floor as per plans. Note that Plumbing work will be filed under subsequent application. No change to Use, Egress or Occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 16-story elevator apartment building built in 1927, with 57 homes, on a 5,288 sq ft lot.
- Built
- 1927
- Floors
- 16
- Residential units
- 57
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R8X
- Lot area
- 5,288 sq ft
- Building area
- 64,125 sq ft
- Historic district
- Park Slope Historic District Extension II
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 9 open notices on record for this building, out of 51 notices on file; the most recent was issued Dec 29, 2020.
- Elevator
Issued Dec 29, 2020
- No report and / or late filing (facade)
Issued Jan 31, 2019 — FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
- (other bldgs types) - elevator affirmation of
Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
6 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01453516-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01453516-I1
- BBL
- 3010600008
- Postal code
- 11217 · 3350 filings
- Review type
- Standard Plan Examination
- Existing stories
- 15
- Proposed stories
- 15
- Existing dwelling units
- 59
- Proposed dwelling units
- 59








