What the filing says
A public-record reading of the proposed work.
Minor plumbing work in association with interior renovation at apartment # 7-c as per plans. this application will not affect any use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 16-story elevator apartment building built in 1927, with 57 homes, on a 5,288 sq ft lot.
- Built
- 1927
- Floors
- 16
- Residential units
- 57
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R8X
- Lot area
- 5,288 sq ft
- Building area
- 64,125 sq ft
- Historic district
- Park Slope Historic District Extension II
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 9 open notices on record for this building, out of 51 notices on file; the most recent was issued Dec 29, 2020.
- Elevator
Issued Dec 29, 2020
- No report and / or late filing (facade)
Issued Jan 31, 2019 — FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
- (other bldgs types) - elevator affirmation of
Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
6 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01453516-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01453516-S1
- BBL
- 3010600008
- Postal code
- 11217 · 3350 filings
- Review type
- Standard Plan Examination
- Existing stories
- 15
- Proposed stories
- 15
- Existing dwelling units
- 59
- Proposed dwelling units
- 59