What the filing says
A public-record reading of the proposed work.
General construction (ot-gc) 1st floor - renovation of existing commercial office unit. minor parition demolition, new non-load bearing partitions, interior doors & lighting & millwork
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story office building built in 1903, on a 23,265 sq ft lot.
- Built
- 1903
- Last altered
- 2017
- Floors
- 4
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- M1-2A/R6A
- Lot area
- 23,265 sq ft
- Building area
- 46,615 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 32 notices on file; the most recent was issued May 22, 1990.
- Elevator
Issued May 22, 1990 — (15) CEASE USE "FREIGHT ELEV" # 4F41 UNTIL PLATFORM HIOSTWAY DOOR IS REPLACED (DOOR IN PIT)
- Elevator
Issued Oct 16, 1989 — (15)UNAUTHORIZEE LOCKS
- Elevator
Issued May 15, 1989 — (14&20)REPAIR BOTH GATES & SWITCHES & ADJUST SAME(33&35)REPAIR AND ADJUST BOTH INTERLOCK & HOISTWAY DOORS AS NECESSARY AND RESTORE F41 TO FULL &PROPER SERVICE SO A COMPLETE INSPECTION CAN BE MADE BY AN INSPECTOR FROM THIS DEPT. (51)REPAIR AND RESECURE CAR TOP EXIT COVER
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 19, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01175189-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 65,533 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01175189-I1
- BBL
- 4000490010
- Postal code
- 11101 · 351 filings
- Review type
- Professional Certification
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 0
- Proposed dwelling units
- 0