NYC DOB record · M01347054-I1

10 East 40 Street

10 East 40 Street, Manhattan, NY 10016

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 18, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01347054-I1

10 East 40 Street

Manhattan, NY 10016

Alteration filing · status dated Sep 15, 2026

Current record
Recorded as completed
Proposed scale
48 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01347054-I1 as a alteration filing at 10 East 40 Street, Manhattan, NY 10016. Its latest published status category is Recorded as completed, dated Sep 15, 2026. The filing records 48 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 15, 2026
Proposed scale
48 proposed stories
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1017601Applicant of recordSee the 25 filings that name Desimone Consulting Engineering
FiledJan 27, 2026
Current recordRecorded as completed
Proposed scale48 stories
Recorded cost$10,000

What the filing says

A public-record reading of the proposed work.

Infill existing stair and provide new framing and concrete slab on metal deck on partial 22nd floor as per plans. No change to use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 48-story office building built in 1928, on a 14,714 sq ft lot.

Built
1928
Last altered
2008
Floors
48
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-2.5
Lot area
14,714 sq ft
Building area
442,042 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 253 notices on file; the most recent was issued Dec 1, 2021.

  • Failure to post energy

    Issued Dec 1, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Elevator

    Issued Sep 7, 2021

  • Failure to post energy

    Issued Apr 29, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • 5 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01347054-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01347054-I1
BBL
1008690066
Review type
Professional Certification
Existing stories
48
Proposed stories
48
Existing dwelling units
0
Proposed dwelling units
0
Structural work