What the filing says
A public-record reading of the proposed work.
Repair and replacement of corrosion at stair 'X' from cellar to basement level and repairs of existing stair 'K' from sub-basement to ground level. (No change of use, egress or occupancy)
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story place of public assembly built in 1941, on a 140,000 sq ft lot.
- Built
- 1941
- Last altered
- 1987
- Floors
- 5
- Residential units
- 0
- Building type
- Place of public assembly
- Land use
- Public facilities and institutions
- Zoning district
- R6
- Lot area
- 140,000 sq ft
- Building area
- 206,640 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 151 notices on file; the most recent was issued Oct 1, 2019.
- Retaining
Issued Oct 1, 2019 — FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
- Local law 10/81 -
Issued Jan 13, 1997
- Local law 62/91 - boilers
Issued Aug 16, 1993
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00594910-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00594910-I1
- BBL
- 3011830002
- Postal code
- 11238 · 2849 filings
- Review type
- Standard Plan Examination
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








