NYC DOB record · B01281821-I1

10 Nevins Street

10 Nevins Street, Brooklyn, NY 11217

Alteration filing in Downtown Brooklyn-Dumbo-Boerum Hill, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 9, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01281821-I1

10 Nevins Street

Brooklyn, NY 11217

Alteration filing · status dated Oct 6, 2026

Current record
Recorded as completed
Proposed scale
24 stories
Dwelling units
184
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01281821-I1 as a alteration filing at 10 Nevins Street, Brooklyn, NY 11217. Its latest published status category is Recorded as completed, dated Oct 6, 2026. The filing records 24 proposed stories and 184 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 6, 2026
Proposed scale
24 proposed stories and 184 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 3426629Applicant of recordSee the 45 filings that name Lu Ning Architecture, PLLC
FiledSep 9, 2025
Current recordRecorded as completed
Proposed scale24 stories
Recorded cost$180,700

What the filing says

A public-record reading of the proposed work.

Interior tenant fit out for vacant commercial space. work include partition changes and associated mechanical work. no change to use egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 27-story condominium built in 2018, with 184 homes, on a 13,519 sq ft lot.

Built
2018
Floors
27
Residential units
184
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
C6-4
Lot area
13,519 sq ft
Building area
142,004 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 9, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01281821-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,037 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01281821-I1
BBL
3001617501
Review type
Professional Certification
Existing stories
24
Proposed stories
24
Existing dwelling units
184
Proposed dwelling units
184
General construction