What the filing says
A public-record reading of the proposed work.
Temporary trolley beam system as per drawings during building alteration, filed sep. trolley beam system shall comply with ch 33 of the NYC bc. no change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story place of worship built in 1901, on a 12,060 sq ft lot.
- Built
- 1901
- Last altered
- 1986
- Floors
- 4
- Residential units
- 0
- Building type
- Place of worship
- Land use
- Public facilities and institutions
- Zoning district
- R10A
- Lot area
- 12,060 sq ft
- Building area
- 11,755 sq ft
- Historic district
- Upper West Side / Central Park West Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 12 open notices on record for this building, out of 26 notices on file; the most recent was issued May 15, 2014.
- Low pressure boiler
Issued May 15, 2014 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
- Local law 62/91 - boilers
Issued Jan 1, 2009
- Local law 62/91 - boilers
Issued Jan 3, 2008
9 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01232280-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01232280-I1
- BBL
- 1011200033
- Postal code
- 10023 · 397 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source








