What the filing says
A public-record reading of the proposed work.
Installation of a heavy duty sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 8-story government property built in 1931, on a 140,000 sq ft lot.
- Built
- 1931
- Last altered
- 1993
- Floors
- 8
- Residential units
- 0
- Building type
- Government property
- Land use
- Public facilities and institutions
- Zoning district
- M3-1
- Lot area
- 140,000 sq ft
- Building area
- 902,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 31, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 8 notices on file; the most recent was issued Dec 7, 2023.
- Construction
Issued Dec 7, 2023 — AT TIME OF INSPECTION OBSERVED AT EXP#2 FACADE IN STATE OF DISREPAIR. PIECE OF DECORATIVE STONE DISPLACED AND IN DANGER TO COLLAPSE BETWEEN 3RD AND 4 FLOOR.
- Construction
Issued Apr 2, 1998 — HAZARDOUS
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 31, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01476049-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 90,393 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01476049-I1
- BIN
- 3009828
- BBL
- 3006670001
- Postal code
- 11232 · 1688 filings
- Review type
- Professional Certification
- Existing stories
- 8
- Proposed stories
- 8
- Existing dwelling units
- 2
- Proposed dwelling units
- 2








