NYC DOB record · B00545423-I1

100 Henry Street

100 Henry Street, Brooklyn, NY 11201

Alteration filing in Brooklyn Heights, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Aug 31, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00545423-I1

100 Henry Street

Brooklyn, NY 11201

Alteration filing · status dated Jul 13, 2026

Current record
Approved
Proposed scale
12 stories
Dwelling units
671
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00545423-I1 as a alteration filing at 100 Henry Street, Brooklyn, NY 11201. Its latest published status category is Approved, dated Jul 13, 2026. The filing records 12 proposed stories and 671 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Jul 13, 2026
Proposed scale
12 proposed stories and 671 proposed dwelling units
Complete building dossierView all 4 filings associated with BIN 3335928
FiledNov 18, 2021
Current recordApproved
Proposed scale12 stories
Recorded cost$376,170

What the filing says

A public-record reading of the proposed work.

Facade repair

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 12-story hotel built in 1888, on a 39,950 sq ft lot.

Built
1888
Last altered
1997
Floors
12
Residential units
0
Building type
Hotel
Land use
Public facilities and institutions
Zoning district
R7-1
Lot area
39,950 sq ft
Building area
319,080 sq ft
Historic district
Brooklyn Heights Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 10 open notices on record for this building, out of 219 notices on file; the most recent was issued Aug 4, 2025.

  • Construction

    Issued Aug 4, 2025 — EMERGNECY WORK ORDER.ON 8/3/25,SEV DETERIORTD STEEL FRAME MARQUEE APPROX 20'W X 15D ABVE MTA 2/3 SBWY PRTLLY CLLPSD ONTO EXP1SDWLK@HENRY ST@RISK OF FRTHR CLLPSE.SIMILAR MARQUEE@EXP2 WAS SAGGNG.OWNR TO IMMED NYSPE&GC TO:1.PE TO SBMT MEANS&METHODS FOR EMRGNCY DEMO@EXP1&2 MARQUEEE,2.DEMO EXP1 MARQUEE BY HAND

  • Hazardous condition (facade)

    Issued Feb 21, 2024 — CYCLE 9C UNSAFE REPORT FILED

  • No report and / or late filing (facade)

    Issued Apr 30, 2019 — FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019

  • 7 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00545423-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00545423-I1
BBL
3002310001
Review type
Professional Certification
Existing stories
12
Proposed stories
12
Existing dwelling units
671
Proposed dwelling units
671
General construction