NYC DOB record · M00805192-I1

100 West 58 Street

100 West 58 Street, Manhattan, NY 10019

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is on hold - pending supersede of applicant of record.

The filing is paused until an administrative step is completed. It has not been rejected. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00805192-I1

100 West 58 Street

Manhattan, NY 10019

Alteration filing · status dated Nov 10, 2026

Current record
Under review
Proposed scale
15 stories
Dwelling units
103
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00805192-I1 as a alteration filing at 100 West 58 Street, Manhattan, NY 10019. Its latest published status category is Under review, dated Nov 10, 2026. The filing records 15 proposed stories and 103 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Nov 10, 2026
Proposed scale
15 proposed stories and 103 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1023732Applicant of recordSee the 4 filings that name Gertler & Wente Architects
FiledFeb 9, 2023
Current recordUnder review
Proposed scale15 stories
Recorded cost$195,000

What the filing says

A public-record reading of the proposed work.

Filing alt-2 for interior removals and renovations of fire damaged building. work to include repair and replacement of non load bearing partitions, no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 17-story condominium built in 1926, with 102 homes, on a 10,017 sq ft lot.

Built
1926
Last altered
2005
Floors
17
Residential units
102
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
C5-1
Lot area
10,017 sq ft
Building area
126,196 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 12, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00805192-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “On Hold - Pending Supersede of Applicant of Record.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,779 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00805192-I1
BBL
1010107505
Review type
Professional Certification
Existing stories
15
Proposed stories
15
Existing dwelling units
103
Proposed dwelling units
103
General construction