What the filing says
A public-record reading of the proposed work.
Furnish and install two (2) 3-ton split systems each complete with one (1) roof-mounted condenser and three (3) ductless air handling units, and all associated piping and power connections in office unit.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story condominium built in 1965, on a 50,874 sq ft lot.
- Built
- 1965
- Last altered
- 2018
- Floors
- 4
- Residential units
- 0
- Building type
- Condominium
- Land use
- Commercial and office
- Zoning district
- M1-2A
- Lot area
- 50,874 sq ft
- Building area
- 145,096 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 34 notices on file; the most recent was issued Jul 6, 2001.
- Construction
Issued Jul 6, 2001 — WORK WITHOUT A PERMIT WORK NOTED: REMOVED EXISTINY WINDOWS AND REPLACED WITH CONCRETE BLOCK AND GLASS BLOCK AT 2,3,4 STORY SOUTH WALL INSTALLED SAB ROOF OVER EXISTING ROOF WITH METAL STADS AND METAL SHEETING. REMEDY: OBTAIN A PERMIT IF FEASIBLE OR RESTORE PREMISES TO PRIOR LEGAL CONDITION
- Construction
Issued May 26, 2001 — WORK WITHOUT A PERMIT. WORK NOTED: REMOVED EXISTING WINDOWS & REPLACED WITH BLOCK WALL & CLAY BLOCK AT 2,3,4TH STORY SOUTH SIDE WALLS. CREATE SUB ROOF OVER EXISTING ROOF WITH METAL SHEETING AND STUDS REMEDY: OBTAIN PERMIT
- Construction
Issued Sep 22, 1999 — WORK WITHOUT A PERMIT. WORK NOTED: SUB ROOF OVER EXISTING ROOF, WITH METAL SHEETING AND METAL STUDS WITHOUT FIRST OBTAINING A PERMIT REMEDY: OBTAIN A PERMIT IF FEASBLE, AND MAKE ROOF AS PER CODE, OR RE- MOVE ILLEGAL STRUCTURE
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00338635-P1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00338635-P1
- BBL
- 3011427502
- Postal code
- 11238 · 2876 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0