What the filing says
A public-record reading of the proposed work.
Minor plan amendment to SOE design only which is associated with the tank replacement. Use of Mechanical Construction Equipment to lift, hoist and move material, earth and personnel on site. No change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story government property built in 1973, on a 32,491 sq ft lot.
- Built
- 1973
- Floors
- 2
- Residential units
- 0
- Building type
- Government property
- Land use
- Public facilities and institutions
- Zoning district
- R5
- Lot area
- 32,491 sq ft
- Building area
- 30,160 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 25 notices on file; the most recent was issued Nov 8, 2019.
- Low pressure boiler
Issued Nov 8, 2019 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
- Low pressure boiler
Issued Apr 6, 2018 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00584575-P1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00584575-P1
- BBL
- 3040510016
- Postal code
- 11208 · 1590 filings
- Review type
- Professional Certification
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








