NYC DOB record · B01463957-I1

1000 Washington Avenue

1000 Washington Avenue, Brooklyn, NY 11225

Alteration filing in Prospect Park, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01463957-I1

1000 Washington Avenue

Brooklyn, NY 11225

Alteration filing · status dated Nov 10, 2026

Current record
Approved
Proposed scale
2 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01463957-I1 as a alteration filing at 1000 Washington Avenue, Brooklyn, NY 11225. Its latest published status category is Approved, dated Nov 10, 2026. The filing records 2 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 10, 2026
Proposed scale
2 proposed stories
The building, not the filingopen housing violations, the owner of record and every filing at BIN 3337842Applicant of recordSee the 6 filings that name Wayne Rendely
FiledOct 13, 2026
Current recordApproved
Proposed scale2 stories
Recorded cost$20,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary artworks and production structures, no alt to exist structures for the seasonal Lightscape. TPA not req. Producer responsible to monitor site safety & implement HWAP. All prod equip removed upon event completion.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a outdoor recreation facility built in 2014, on a 2,691,000 sq ft lot.

Built
2014
Residential units
0
Building type
Outdoor recreation facility
Land use
Open space and outdoor recreation
Zoning district
PARK
Lot area
2,691,000 sq ft
Building area
67,081 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 12, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01463957-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,779 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01463957-I1
BBL
3011830001
Review type
Professional Certification
Existing stories
2
Proposed stories
2
Existing dwelling units
0
Proposed dwelling units
0
General construction