What the filing says
A public-record reading of the proposed work.
Interior renovation of existing gym on the first floor. no change in occupancy, use or egress
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story office building built in 1925, on a 16,650 sq ft lot.
- Built
- 1925
- Last altered
- 2006
- Floors
- 5
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- R6A
- Lot area
- 16,650 sq ft
- Building area
- 66,500 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 14 notices on file; the most recent was issued Jul 17, 2026.
- Construction
Issued Jul 17, 2026 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT #321481589 ON 4/6/26, DUE TO CONTRACTOR WITHDRAWAL.
- Construction
Issued Jan 9, 2026 — EWO: ACTIVE PARKING STRUCTURE 1 LVL BELOW GRALE TRACKS ON 16 FALL MASONRY PERIPHERAL WALLS WITH BEARING ATOP. UNSAFE NOTIFICATION THAT POINT LOADS FROM SUPPORTED BEAMS TRANSFERRED TO WALL & HIGHER THAN LOAD CARRYING CAPACITY OF WALL. REMEDY:OWNERS TO RETAIN NYS RDP TO DIRECT & SUPV INSTALLATION OF SAFETY MEASURES (SHORING, ETC.)
- Failure to post energy
Issued Dec 1, 2023 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 9, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01414879-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,348 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01414879-I1
- BIN
- 3039624
- BBL
- 3014800010
- Postal code
- 11221 · 3283 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 0
- Proposed dwelling units
- 0