What the filing says
A public-record reading of the proposed work.
1 new steam table @1st.fl. connected with a 3/4" gas line to existing riser at cellar.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story store building built in 1931, on a 2,375 sq ft lot.
- Built
- 1931
- Floors
- 2
- Residential units
- 1
- Building type
- Store building
- Land use
- Mixed residential and commercial
- Zoning district
- M1-1
- Lot area
- 2,375 sq ft
- Building area
- 3,050 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Oct 2, 2007.
- Immediate
Issued Oct 2, 2007
- Construction
Issued May 7, 2001 — WORK WITHOUT A PERMIT. NOTED: 2ND FLR ERECTED INTERIOR WOOD PARTITION AND ERECTED A GIRDER, BEAM AT ROOF, AND ALSO FLOOR JOIST AND FLOOR DAMAGE THROUGHOUT 2ND FLOOR REMEDY: STOP ALL WORK. OBTAIN A PERMIT WITH AN ENGINEER'S STRUCTURAL STABILITY REPORT, CONTACT THIS OFFICE AT (718) 802-4035 PRIOR TO
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00421128-P2.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00421128-P2
- BBL
- 3031490001
- Postal code
- 11237 · 1243 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 1
- Proposed dwelling units
- 1