What the filing says
A public-record reading of the proposed work.
Plumbing work filed in conjunction with the combing and renovation of units 15c, 15d and 15e. kitchen and bathroom renovation.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 17-story elevator apartment building built in 1931, with 204 homes, on a 8,900 sq ft lot.
- Built
- 1931
- Last altered
- 1984
- Floors
- 17
- Residential units
- 204
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6B
- Lot area
- 8,900 sq ft
- Building area
- 137,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 43 notices on file; the most recent was issued Feb 22, 2023.
- No report and / or late filing (facade)
Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
- Fail to certify class
Issued Oct 30, 2019 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Local law 11/98 - facade
Issued Aug 8, 2002
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 19, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00650561-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00650561-S1
- BBL
- 3021000072
- Postal code
- 11217 · 3239 filings
- Review type
- Standard Plan Examination
- Existing stories
- 17
- Proposed stories
- 17
- Existing dwelling units
- 204
- Proposed dwelling units
- 204