NYC DOB record · B00584904-I1

1010 Bushwick Avenue

1010 Bushwick Avenue, Brooklyn, NY 11221

Alteration filing in Bushwick (East), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00584904-I1

1010 Bushwick Avenue

Brooklyn, NY 11221

Alteration filing · status dated Sep 29, 2021

Current record
Recorded as completed
Proposed scale
7 stories
Dwelling units
20
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00584904-I1 as a alteration filing at 1010 Bushwick Avenue, Brooklyn, NY 11221. Its latest published status category is Recorded as completed, dated Sep 29, 2021. The filing records 7 proposed stories and 20 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 29, 2021
Proposed scale
7 proposed stories and 20 proposed dwelling units
The building, not the filingEvery filing at BIN 3428716, with the parcel and violation recordApplicant of recordSee the 2 filings that name Ashwani Khanna PE
FiledSep 21, 2021
Current recordRecorded as completed
Proposed scale7 stories
Recorded cost$40,000

What the filing says

A public-record reading of the proposed work.

Providing railing, fall protection, construction debris removal and site safety measures at a halt construction site as detailed on plans. Please see comments for details.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story elevator apartment building built in 2018, with 13 homes, on a 5,400 sq ft lot.

Built
2018
Last altered
2017
Floors
7
Residential units
13
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R6
Lot area
5,400 sq ft
Building area
20,191 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 16 notices on file; the most recent was issued Jun 17, 2021.

  • Construction

    Issued Jun 17, 2021 — EMERGENCY WORK ORDER DUE TO UNSAFE FORMWORK AT 6TH AND 7TH FLOORS REMEDY: REMOVE ALL FORMWORK FROM THE 7TH AND 6TH FLOOR ALSO ALL DECAY AND ROTTEN PLYWOOD TO AVOID ANY FALLING AND FLYING DEBRIS, BECAUSE OF TIME UNUSED. ALL WORK MUST BE SUPERVISED BY NYS LIC PE PERFORM WORK IMMED WITH DAILY ENGINEER'S REPORTS

  • Construction

    Issued Mar 24, 2021 — FAILURE TO COMPLY-PREVIOUS OATH SUMMONS 35369130X REQUESTED SUBMISSION OF APPROVED PLANS. PLANS WERE NOT CODE COMPLIANT, SUMMONS 35408684R REQUESTED INSPECTION REPORTS WITH PHOTOS, TR2 COMPRESSION RESULTS AND AS-BUILT PLAN WITH PE DESIGN DWGS TO REMEDY NON CODE COMPLIANT COND REMEDY: PROVIDE FULL SP. INSP. REPORTS, TR2 COMP. RESLUTS

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00584904-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00584904-I1
BBL
3033210028
Review type
Professional Certification
Existing stories
7
Proposed stories
7
Existing dwelling units
0
Proposed dwelling units
20
General construction