What the filing says
A public-record reading of the proposed work.
To address DOB emergency work order per Control# 365315, Repair & replace dislodged brick, cracked parapet, & damaged coping at roof; repoint step cracks/joints on Exp 1, 2, 3; repair defective window lintels, sills, & spandrel. Repair building facade
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1930, with 67 homes, on a 15,900 sq ft lot.
- Built
- 1930
- Last altered
- 1988
- Floors
- 6
- Residential units
- 67
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 15,900 sq ft
- Building area
- 66,456 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 11 open notices on record for this building, out of 49 notices on file; the most recent was issued Aug 6, 2026.
- Construction
Issued Aug 6, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER AS PER SECTION 28.301.1 OF THE NYC ADMIN CODE.NOTED AT TIME OF INSPECTION,OBSERVED AT EXP1 NUMEROUS VERTICAL CRACK AND DETERIORATED MORTAR JOINTS.AT ROOF EL EVATION,DAMAGED AND MISSING COPING STONES.ALSO DAMAGED AND DISPLACED B RICKS.REMEDY:REPAIR AND/OR REPLACE
- Construction
Issued Aug 6, 2026 — EMERGENCY WORK ORDER DUE TO NUMEROUS STEP CRACKS AND LOOSE MORTAR JOIN TS THROUGHOUT EXPOSURE 1 AND 3.AT ROOF ELEVATION,SEVERELY DISLOGED BRI CKS DUE TO LOSS OF MORTAR AND STUCCO ON PARAPET ALSO CRACKED,DAMAGED A ND MISSING COPING STONES.REMEDY:OWNER MUST HIRE NYS LIC REGISTERED PRO FESSIONAL WITH QEWI CERT TO DIRECT,CONDUCT & SUPERVISE ALL WORKS
- Construction
Issued Dec 31, 2025 — FTM BUILDING IN CODE COMPLIANT MANNER. OBSERVED @ EXP1: BULGING CRACKS/STEP CRACKS, BOWED WINDOW LINTEL, MISSING BRICKS, DAMAGED JOINT SPALLING @ MULTIPLE LOCATIONS. ALSO DAMAGED COPING STONE. EXP 3: CRACKS, SPALLING, BROKEN WINDOW SILLS. EXP 4 MISSING COPING STONE, CRACKS, SPALLING. REMEDY: REPAIR AND/OR REPLACE
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01456073-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01456073-I1
- BIN
- 2023482
- BBL
- 2037150011
- Postal code
- 10472 · 118 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 58
- Proposed dwelling units
- 58








