NYC DOB record · B00492901-P2

1020 Rogers Avenue

1020 Rogers Avenue, Brooklyn, NY 11226

Alteration filing in East Flatbush-Erasmus, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00492901-P2

1020 Rogers Avenue

Brooklyn, NY 11226

Alteration filing · status dated Aug 25, 2022

Current record
Approved
Proposed scale
7 stories
Dwelling units
28
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00492901-P2 as a alteration filing at 1020 Rogers Avenue, Brooklyn, NY 11226. Its latest published status category is Approved, dated Aug 25, 2022. The filing records 7 proposed stories and 28 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 25, 2022
Proposed scale
7 proposed stories and 28 proposed dwelling units
Complete building dossierView all 4 filings associated with BIN 3425060Applicant of recordSee the 54 filings that name Versatile Engineering, P.C.
FiledJun 19, 2022
Current recordApproved
Proposed scale7 stories
Recorded cost$1,300

What the filing says

A public-record reading of the proposed work.

File post approval amendment in order to reflect minor changes in structural and soe drawings.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story condominium built in 2022, on a 14,809 sq ft lot.

Built
2022
Floors
7
Building type
Condominium
Zoning district
R6
Lot area
14,809 sq ft
Building area
1,038,251 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 2 notices on file; the most recent was issued Dec 24, 2023.

  • Construction

    Issued Dec 24, 2023 — STRUCTURE RENDERED NON COMPLIANT DUE TO VEHICLE STRIKING SHED. AT TIME OF INSPECTION APPROXIMATELY 25 LINEAR FEET OF SHED HAS BEEN DISPLACED

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 2, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00492901-P2.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00492901-P2
BBL
3051377501
Review type
Standard Plan Examination
Existing stories
30
Proposed stories
7
Existing dwelling units
3
Proposed dwelling units
28
General constructionStructural workFoundation workEarthwork