NYC DOB record · B01101106-I1

1025 Eastern Parkway

1025 Eastern Parkway, Brooklyn, NY 11213

Alteration filing in Crown Heights (North), Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 1, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01101106-I1

1025 Eastern Parkway

Brooklyn, NY 11213

Alteration filing · status dated Oct 29, 2026

Current record
Approved
Proposed scale
5 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01101106-I1 as a alteration filing at 1025 Eastern Parkway, Brooklyn, NY 11213. Its latest published status category is Approved, dated Oct 29, 2026. The filing records 5 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 29, 2026
Proposed scale
5 proposed stories
The building, not the filingopen housing violations and every filing at BIN 3037303Applicant of recordSee the 4 filings that name Loci Architecture PLLC
FiledSep 16, 2024
Current recordApproved
Proposed scale5 stories
Recorded cost$267,000

What the filing says

A public-record reading of the proposed work.

Scope of work includes removal of existing closets, installation of new partition, new cabinets, sinks at new countertops, replacement of existing drinking fountain with new one dual level drinking fountain, installation of door opener.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story educational building built in 1907, on a 44,000 sq ft lot.

Built
1907
Last altered
2005
Floors
5
Residential units
0
Building type
Educational building
Land use
Public facilities and institutions
Zoning district
R6
Lot area
44,000 sq ft
Building area
65,742 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 1, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 24 notices on file; the most recent was issued Sep 16, 2026.

  • Construction

    Issued Sep 16, 2026 — EMERGENCY WORK ORDER DUE TO: CRACKED/SPALLING STONES AT EXPOSURE #3 NORTH ELEVATION @ 4FL N.E. CORNER AND AT 2FL NEAR "EXIT 6" OF BUILDING REMEDY: IMMEDIATELY INSTALL SIDEWALK SHEDS @ EXPOSURE #3 NORTH ELEVATION AT N.W. CORNER AND AT EXIT 6 DOORWAY UNDER DIRECTION OF A LICENSED PROFESSIONAL

  • Construction

    Issued Sep 16, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. CRACKED WINDOW PANES ON EXPOSURE #1 SOUTH ELEVATION AND EXPOSURE #4 N.E. CORNER AND AT EXPOSURE #3 NORTH ELEVATION, AT 4TH FLOOR N.E. CORNER AND AT 2ND FLOOR NEAR "EXIT 6" OF BUILDING. REMEDY: REPAIR AND/OR REPLACE

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 31, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01101106-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,066 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01101106-I1
BBL
3013890035
Review type
Standard Plan Examination
Existing stories
5
Proposed stories
5
Existing dwelling units
0
Proposed dwelling units
0
General construction