What the filing says
A public-record reading of the proposed work.
Installation of two new sinks and one dual level drinking fountain, plus height adjustment of one existing drinking fountain - all on third floor.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story educational building built in 1907, on a 44,000 sq ft lot.
- Built
- 1907
- Last altered
- 2005
- Floors
- 5
- Residential units
- 0
- Building type
- Educational building
- Land use
- Public facilities and institutions
- Zoning district
- R6
- Lot area
- 44,000 sq ft
- Building area
- 65,742 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 24 notices on file; the most recent was issued Sep 16, 2026.
- Construction
Issued Sep 16, 2026 — EMERGENCY WORK ORDER DUE TO: CRACKED/SPALLING STONES AT EXPOSURE #3 NORTH ELEVATION @ 4FL N.E. CORNER AND AT 2FL NEAR "EXIT 6" OF BUILDING REMEDY: IMMEDIATELY INSTALL SIDEWALK SHEDS @ EXPOSURE #3 NORTH ELEVATION AT N.W. CORNER AND AT EXIT 6 DOORWAY UNDER DIRECTION OF A LICENSED PROFESSIONAL
- Construction
Issued Sep 16, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. CRACKED WINDOW PANES ON EXPOSURE #1 SOUTH ELEVATION AND EXPOSURE #4 N.E. CORNER AND AT EXPOSURE #3 NORTH ELEVATION, AT 4TH FLOOR N.E. CORNER AND AT 2ND FLOOR NEAR "EXIT 6" OF BUILDING. REMEDY: REPAIR AND/OR REPLACE
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 31, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01101106-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,779 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01101106-S1
- BBL
- 3013890035
- Postal code
- 11213 · 1728 filings
- Review type
- Standard Plan Examination
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








