NYC DOB record · M00467697-I1

1035 Fifth Avenue

1035 Fifth Avenue, Manhattan, NY 10028

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00467697-I1

1035 Fifth Avenue

Manhattan, NY 10028

Alteration filing · status dated Sep 8, 2026

Current record
Recorded as completed
Proposed scale
15 stories
Dwelling units
75
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00467697-I1 as a alteration filing at 1035 Fifth Avenue, Manhattan, NY 10028. Its latest published status category is Recorded as completed, dated Sep 8, 2026. The filing records 15 proposed stories and 75 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 8, 2026
Proposed scale
15 proposed stories and 75 proposed dwelling units
Applicant of recordSee the 1 filings that name Barbara B Corwin Architect
FiledMay 14, 2021
Current recordRecorded as completed
Proposed scale15 stories
Recorded cost$150,000

What the filing says

A public-record reading of the proposed work.

Interior renovation of an exiting apartment 2d in existing residential building. architectural work only. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 15-story elevator apartment building built in 1925, with 81 homes, on a 19,306 sq ft lot.

Built
1925
Last altered
1989
Floors
15
Residential units
81
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10
Lot area
19,306 sq ft
Building area
233,923 sq ft
Historic district
Metropolitan Museum Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 72 notices on file; the most recent was issued Mar 8, 2025.

  • Construction

    Issued Mar 8, 2025 — TRANSFERRING OBJECTIONS FROM APPLICATION M362752 THAT WERE ISSUED BY INSPECTOR JRP, TO THE OWNER AS A DOB VIOLATION AFTER MULTIPLE FAILED ATTEMPTS AT GAINING ACCESS TO CORRECT THE OBJECTION BY THE CONTRACTOR.EGC NOT PROPERLY TERMINATED250.8, BOXES SET BACK T-OUT 314.20, KNOCKOUTS IN PANEL 110.12A, NO GFCI FOR KITCHEN COUNTER250.8A

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION

  • 4 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00467697-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00467697-I1
BIN
1046826
BBL
1014960071
Review type
Standard Plan Examination
Existing stories
15
Proposed stories
15
Existing dwelling units
75
Proposed dwelling units
75
General construction