What the filing says
A public-record reading of the proposed work.
Interior renovation of an exiting apartment 2d in existing residential building. architectural work only. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 15-story elevator apartment building built in 1925, with 81 homes, on a 19,306 sq ft lot.
- Built
- 1925
- Last altered
- 1989
- Floors
- 15
- Residential units
- 81
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R10
- Lot area
- 19,306 sq ft
- Building area
- 233,923 sq ft
- Historic district
- Metropolitan Museum Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 72 notices on file; the most recent was issued Mar 8, 2025.
- Construction
Issued Mar 8, 2025 — TRANSFERRING OBJECTIONS FROM APPLICATION M362752 THAT WERE ISSUED BY INSPECTOR JRP, TO THE OWNER AS A DOB VIOLATION AFTER MULTIPLE FAILED ATTEMPTS AT GAINING ACCESS TO CORRECT THE OBJECTION BY THE CONTRACTOR.EGC NOT PROPERLY TERMINATED250.8, BOXES SET BACK T-OUT 314.20, KNOCKOUTS IN PANEL 110.12A, NO GFCI FOR KITCHEN COUNTER250.8A
- Low pressure boiler
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
- Low pressure boiler
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
4 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00467697-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00467697-I1
- BIN
- 1046826
- BBL
- 1014960071
- Postal code
- 10028 · 234 filings
- Review type
- Standard Plan Examination
- Existing stories
- 15
- Proposed stories
- 15
- Existing dwelling units
- 75
- Proposed dwelling units
- 75