NYC DOB record · B01048694-I1

1037 Dahill Road

1037 Dahill Road, Brooklyn, NY 11204

Alteration filing in Mapleton-Midwood (West), Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 25, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01048694-I1

1037 Dahill Road

Brooklyn, NY 11204

Alteration filing · status dated Oct 22, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01048694-I1 as a alteration filing at 1037 Dahill Road, Brooklyn, NY 11204. Its latest published status category is Approved, dated Oct 22, 2026. The filing records 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 22, 2026
Proposed scale
1 proposed dwelling unit
Applicant of recordSee the 31 filings that name Pramodray Shah, P.E.
FiledMay 10, 2024
Current recordApproved
Proposed scale1 units
Recorded cost$19,500

What the filing says

A public-record reading of the proposed work.

PL work type in conjunction with job#322088012

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story one-family home built in 1915, on a 2,000 sq ft lot.

Built
1915
Floors
2
Residential units
1
Building type
One-family home
Land use
One and two family homes
Zoning district
R5
Lot area
2,000 sq ft
Building area
1,440 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 25, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Jul 10, 2025.

  • Plumbing

    Issued Jul 10, 2025 — BASED ON LIC # 1343 BEING INACTIVE, STOP ALL PLUMBING WORK UNDER JOB #B01048694 IMMEDIATELY.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 25, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01048694-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 86,498 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01048694-I1
BIN
3130402
BBL
3054830082
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
1
Proposed dwelling units
1