NYC DOB record · Q01315865-S3

104-20 125 Street

104-20 125 Street, Queens, NY 11419

New building filing in South Ozone Park, Queens. The latest DOB status is plan examiner review.

A DOB plan examiner is reviewing the application. Nothing has been approved yet. What every status means

Under reviewNew building

NYC Department of Buildings · w9ak-ipjd · accessed Oct 16, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01315865-S3

104-20 125 Street

Queens, NY 11419

New building · status dated Oct 13, 2026

Current record
Under review
Proposed scale
2 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01315865-S3 as a new building at 104-20 125 Street, Queens, NY 11419. Its latest published status category is Under review, dated Oct 13, 2026. The filing records 2 proposed stories and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Under review
Latest status date
Oct 13, 2026
Proposed scale
2 proposed stories and 2 proposed dwelling units
The building, not the filingEvery filing at BIN 4204522, with the parcel and violation recordApplicant of recordSee the 102 filings that name Bayside Engineering PC
FiledOct 13, 2026
Current recordUnder review
Proposed scale2 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Proposed installation of fully residential plumbing and sprinkler system.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a vacant land on a 2,000 sq ft lot.

Last altered
2022
Residential units
0
Building type
Vacant land
Land use
Vacant land
Zoning district
R3A
Lot area
2,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 15, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01315865-S3.

    01
  2. Current status updated

    The latest recorded filing status is “Plan Examiner Review.”

    02

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 85,681 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01315865-S3
BBL
4095780017
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
2
Existing dwelling units
Empty in the source
Proposed dwelling units
2