NYC DOB record · M01391025-P1

1045 Madison Avenue

1045 Madison Avenue, Manhattan, NY 10075

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01391025-P1

1045 Madison Avenue

Manhattan, NY 10075

Alteration filing · status dated Oct 19, 2026

Current record
Approved
Proposed scale
18 stories
Dwelling units
17
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01391025-P1 as a alteration filing at 1045 Madison Avenue, Manhattan, NY 10075. Its latest published status category is Approved, dated Oct 19, 2026. The filing records 18 proposed stories and 17 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 19, 2026
Proposed scale
18 proposed stories and 17 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1046469Applicant of recordSee the 43 filings that name R.J. Mcgee Engineering, PLLC
FiledOct 16, 2026
Current recordApproved
Proposed scale18 stories
Recorded cost$60,000

What the filing says

A public-record reading of the proposed work.

Modifications to existing plumbing and sprinkler systems in ground floor commercial tenant space. no change to use, occupancy or egress

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 18-story condominium built in 2020, with 17 homes, on a 6,032 sq ft lot.

Built
2020
Last altered
2020
Floors
18
Residential units
17
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
C5-1
Lot area
6,032 sq ft
Building area
69,675 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 21, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 10 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01391025-P1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 83,982 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01391025-P1
BBL
1014917504
Review type
Professional Certification
Existing stories
18
Proposed stories
18
Existing dwelling units
17
Proposed dwelling units
17