NYC DOB record · B00226457-P3

105 North 13 Street

105 North 13 Street, Brooklyn, NY 11249

Alteration filing in Williamsburg, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00226457-P3

105 North 13 Street

Brooklyn, NY 11249

Alteration filing · status dated Sep 1, 2023

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00226457-P3 as a alteration filing at 105 North 13 Street, Brooklyn, NY 11249. Its latest published status category is Approved, dated Sep 1, 2023. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 1, 2023
Proposed scale
Not stated in this filing
The building, not the filingthe owner of record and every filing at BIN 3061527Applicant of recordSee the 195 filings that name Sharon Engineering, P.C
FiledAug 31, 2023
Current recordApproved
Proposed scaleNot specified
Recorded cost$150,000

What the filing says

A public-record reading of the proposed work.

MH Worktype herewith filed in conjunction with alt one job number 321957977

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story office building built in 2017, on a 12,500 sq ft lot.

Built
2017
Last altered
2015
Floors
7
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
M1-2
Lot area
12,500 sq ft
Building area
62,779 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 5 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00226457-P3.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00226457-P3
BBL
3022790034
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0
mechanical