What the filing says
A public-record reading of the proposed work.
Interior renovation to non-load bearing interior paritions, single apartment unit in multifamily residential condominum building. there is no change inuse, exits or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 12.5-story condominium built in 1913, with 34 homes, on a 6,028 sq ft lot.
- Built
- 1913
- Floors
- 12.5
- Residential units
- 34
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C4-6A
- Lot area
- 6,028 sq ft
- Building area
- 41,571 sq ft
- Historic district
- Upper West Side / Central Park West Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 46 notices on file; the most recent was issued Sep 1, 2022.
- Construction
Issued Sep 1, 2022 — THE DOB HEREBY ORDERS YOU TO STOP ALL WORK UNDER JOB # M00614208 - EXCEPT TO MAKE SITE SAFE - DUE TO APPLICANT OF RECORD ALBERTO ROMAN, PE, SURRENDERED ALL FILING PRIVILEGES
- Construction
Issued Sep 1, 2022 — THE DOB HEREBY ORDERS YOU TO STOP ALL WORK UNDER JOB # M00614208 - EXCEPT TO MAKE SITE SAFE - DUE TO APPLICANT OF RECORD ALBERTO ROMAN, PE, SURRENDERED ALL FILING PRIVILEGES
- Construction
Issued Mar 27, 2009
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00999932-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00999932-I1
- BIN
- 1029969
- BBL
- 1011447501
- Postal code
- 10023 · 618 filings
- Review type
- Standard Plan Examination
- Existing stories
- 12
- Proposed stories
- 12
- Existing dwelling units
- 34
- Proposed dwelling units
- 34








