NYC DOB record · B00571780-S5

1059 Greene Avenue

1059 Greene Avenue, Brooklyn, NY 11221

Alteration filing in Bushwick (East), Brooklyn. The latest DOB status is filing withdrawn.

The applicant withdrew this filing, so it is not going forward. What every status means

Closed or withdrawnAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00571780-S5

1059 Greene Avenue

Brooklyn, NY 11221

Alteration filing · status dated Jun 10, 2024

Current record
Closed or withdrawn
Proposed scale
3 stories
Dwelling units
3
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00571780-S5 as a alteration filing at 1059 Greene Avenue, Brooklyn, NY 11221. Its latest published status category is Closed or withdrawn, dated Jun 10, 2024. The filing records 3 proposed stories and 3 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Closed or withdrawn
Latest status date
Jun 10, 2024
Proposed scale
3 proposed stories and 3 proposed dwelling units
The building, not the filingEvery filing at BIN 3074972, with the parcel and violation recordApplicant of recordSee the 478 filings that name Cl Engineering P.C.
FiledNot recorded
Current recordClosed or withdrawn
Proposed scale3 stories
Recorded cost$34,000

What the filing says

A public-record reading of the proposed work.

Structural filing in conjunction with Application #B00571780-I1.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story walk-up apartment building built in 1920, with 3 homes, on a 1,925 sq ft lot.

Built
1920
Floors
3
Residential units
3
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
1,925 sq ft
Building area
2,679 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Current status updated

    The latest recorded filing status is “Filing Withdrawn.”

    01

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00571780-S5
BBL
3032830051
Review type
Professional Certification
Existing stories
3
Proposed stories
3
Existing dwelling units
3
Proposed dwelling units
3
Structural work