What the filing says
A public-record reading of the proposed work.
File construction work on mixed-use building on 1st floor eating and drinking establishments with remove door, new partition, door, repair ceiling, wall, floor and painting as per plan. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story elevator apartment building built in 1915, with 48 homes, on a 4,910 sq ft lot.
- Built
- 1915
- Floors
- 7
- Residential units
- 48
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- C6-1
- Lot area
- 4,910 sq ft
- Building area
- 30,582 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 12 notices on file; the most recent was issued Nov 1, 2023.
- Failure to correct swarmp conditions (facade)
Issued Nov 1, 2023 — FAILURE TO CORRECT SWARMP CONDITIONS
- Hazardous condition (facade)
Issued Sep 20, 2023 — CYCLE 9A UNSAFE REPORT FILED
- No report and / or late filing (facade)
Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01439632-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01439632-I1
- BBL
- 1001990034
- Postal code
- 10013 · 279 filings
- Review type
- Professional Certification
- Existing stories
- 7
- Proposed stories
- 7
- Existing dwelling units
- 48
- Proposed dwelling units
- 48