NYC DOB record · X00421713-I1

1060 Sherman Avenue

1060 Sherman Avenue, Bronx, NY 10456

Alteration filing in Concourse-Concourse Village, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 1, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X00421713-I1

1060 Sherman Avenue

Bronx, NY 10456

Alteration filing · status dated Oct 30, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
64
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X00421713-I1 as a alteration filing at 1060 Sherman Avenue, Bronx, NY 10456. Its latest published status category is Approved, dated Oct 30, 2026. The filing records 64 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 30, 2026
Proposed scale
64 proposed dwelling units
Applicant of recordSee the 1501 filings that name Green Design
FiledOct 30, 2020
Current recordApproved
Proposed scale64 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the NYC building code.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1927, with 64 homes, on a 13,894 sq ft lot.

Built
1927
Floors
6
Residential units
64
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R7-1
Lot area
13,894 sq ft
Building area
62,042 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 1, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 17 open notices on record for this building, out of 46 notices on file; the most recent was issued Jun 17, 2026.

  • Construction

    Issued Jun 17, 2026 — FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. OBSERVED THE FOLLOWING CONDITIONS: MULTIPLE DEFECT @ EXPOSURE 2,3 & 4 CRACKS/STEP CRACKS, SPALLING AND DAMAGED JOINTS WITH HAZARDOUS DETERIORATION @ EXPOSURE 1: AT COURTYARD & SOUTH OF ENTRANCE BULGING CRACK & STEP CRACKS. REMEDY: REPAIR AND/OR REPLACE

  • Construction

    Issued Oct 3, 2025 — EWO DUE TO IMMINENT HAZARDOUS CONDITION ON EXP#1 PARAPET, RIGHT OF MAIN ENTRANCE OVER STREET SIDEWALK.BLDG STEP CRACK,BRICK WORK @ PARAPET.REMEDY:OWNER MUST IMMEDIATELY REPAIR THIS HAZARDOUS CONDITION U/SUPERVIION OF A LICENSED PROFESSIONAL.OWNER MUST RETAIN LICENSED ENGINEER TO REPORT TO PROGRESS OF REPAIR FACADES@BUILDINGS.NYC.GOV

  • Construction

    Issued Oct 3, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED AT THE TIME OF INSPECTION,I OBSERVED ON EXP1 AT PARAPET ON THE RIGHT OF MAIN ENTRANCE,STEP CRACKS AND BULGING IN BRICK WORK.REMEDY:REPAIR AND/OR RE PLACE ALL DAMAGED BRICK WORK ON BUILDING

  • 14 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 1, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X00421713-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,066 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X00421713-I1
BIN
2002626
BBL
2024510011
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
64
Proposed dwelling units
64
Sidewalk shed