What the filing says
A public-record reading of the proposed work.
Facade repairs with localized structural repairs, coating replacements, and concrete crack and patch repairs as per plans. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 10-story place of public assembly built in 1959, on a 24,147 sq ft lot.
- Built
- 1959
- Floors
- 10
- Residential units
- 0
- Building type
- Place of public assembly
- Land use
- Public facilities and institutions
- Zoning district
- R10
- Lot area
- 24,147 sq ft
- Building area
- 93,924 sq ft
- Historic district
- Expanded Carnegie Hill Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 8, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 73 notices on file; the most recent was issued Aug 30, 2013.
- No report and / or late filing (facade)
Issued Aug 30, 2013 — FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
- Failure to
Issued Jun 3, 2013 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
- Failure to
Issued May 3, 2012 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
3 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 4, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01438734-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01438734-I1
- BBL
- 1015000001
- Postal code
- 10128 · 192 filings
- Review type
- Professional Certification
- Existing stories
- 10
- Proposed stories
- 10
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








