NYC DOB record · B00209100-I1

1078 Fulton Street

1078 Fulton Street, Brooklyn, NY 11238

Alteration filing in Bedford-Stuyvesant (West), Brooklyn. The latest DOB status is filing withdrawn.

The applicant withdrew this filing, so it is not going forward. What every status means

Closed or withdrawnAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00209100-I1

1078 Fulton Street

Brooklyn, NY 11238

Alteration filing · status dated Feb 13, 2024

Current record
Closed or withdrawn
Proposed scale
8 stories
Dwelling units
45
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00209100-I1 as a alteration filing at 1078 Fulton Street, Brooklyn, NY 11238. Its latest published status category is Closed or withdrawn, dated Feb 13, 2024. The filing records 8 proposed stories and 45 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Closed or withdrawn
Latest status date
Feb 13, 2024
Proposed scale
8 proposed stories and 45 proposed dwelling units
Complete building dossierView all 3 filings associated with BIN 3397114Applicant of recordSee the 50 filings that name Azimuth Engineering
FiledApr 6, 2021
Current recordClosed or withdrawn
Proposed scale8 stories
Recorded cost$35,000

What the filing says

A public-record reading of the proposed work.

Installation of new steel equipment platform on steel dunnage on the rooftop (T-Mobile - BK04119C) as per plans. No change to use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 9-story condominium built in 2011, with 45 homes, on a 9,940 sq ft lot.

Built
2011
Floors
9
Residential units
45
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R7D
Lot area
9,940 sq ft
Building area
50,456 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 21 notices are on file, all with a recorded resolution.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00209100-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Filing Withdrawn.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00209100-I1
BBL
3020167501
Review type
Professional Certification
Existing stories
8
Proposed stories
8
Existing dwelling units
45
Proposed dwelling units
45
Structural work