What the filing says
A public-record reading of the proposed work.
Filing for plumbing work in conjunction with interior renovation and correct violations.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story two-family home built in 1925, on a 2,900 sq ft lot.
- Built
- 1925
- Floors
- 2
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R5
- Lot area
- 2,900 sq ft
- Building area
- 1,680 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 9 notices on file; the most recent was issued Jan 21, 2025.
- Construction
Issued Jan 21, 2025 — FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD BLDG IN A STATE OF DISREPAIR DUE TO FIRE.EXP3 WALL IS HEAVILY CHARRD W/A PARTIAL CLLPSE@ THE REAR OF THE BLDG.REAR EXTENSN OF BLDG APPEARS TO BE LEANING.COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #121824FEU40401AK (CONTROL # 341794) IMMEDIATELY
- Construction
Issued Dec 18, 2024 — FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD BLDG IN A STATE OF DISREPAIR DUE TO FIRE.EXP2 WALL IS HEAVILY CHARRD W/A PARTIAL CLLPSE@ THE REAR OF THE BLDG.REAR EXTENSN OF BLDG APPEARS TO BE LEANING.OWNR TO ENGAGE NYSPE&ENDRSD CNTCRTR TO EVAL THE ENT BLDG&RPAIR UNDR PRMT FILE FOR PRMTS BY 1/20/25.SGN OFF RPAIRS BY 3/20/25
- Construction
Issued Dec 17, 2024 — OCCUPANCY CONTRARY. OBSERVED AT CELLAR LEVEL KITCHEN WITH RESIDENTIAL SINK, FRIDGE AND ELECTRIC COOK TUB, 3 PIECE BATHROOM AND 2 BEDROOM WHERE INSUFFICIENT LIGHT AND VENTILATION.
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01222325-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 97,160 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01222325-S1
- BBL
- 4019960067
- Postal code
- 11368 · 486 filings
- Review type
- Professional Certification
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 2
- Proposed dwelling units
- 2








